nor-tec ASD Manuel utilisateur

STEAM
DISTRIBUTORS
ASD / BSD / CSD
Steam Distribution
Installation Manual
IMPORTANT: Read and save this guide for future
reference. This guide to be left with equipment owner.
1506117-B

Table Of Contents
INSTALLATION .....................................1
RECEIVING & UNPACKING EQUIPMENT .....................1
PRE-INSTALLATION.................................1
STEAM LINE INSTALLATION ............................1
GUIDELINES ...................................1
CONDENSATE RETURN GUIDELINES FOR MAIN STEAM LINES ..........2
DISTRIBUTOR MOUNTING...............................3
VERTICAL AIRFLOW ..................................4
HORIZONTAL AIRFLOW ................................5
VERTICAL AIRFLOW ..................................6
DISTRIBUTOR MOUNTING - HORIZONTAL & VERTICAL FLOW ...........7
DISTRIBUTOR MOUNTING...............................7
EXPLODED VIEW ....................................8

INSTALLATION
RECEIVING & UNPACKING EQUIPMENT
1. Check packing slip to ensure ALL material
has been delivered.
2. All material shortages are to be reported to
Walter Meier (NORTEC) within 48 hours
from receipt of goods. Walter Meier
(NORTEC) assumes no responsibility for
any material shortages beyond this period.
3. Inspect shipping boxes for damage and
note on shipping waybill accordingly.
4. After unpacking, inspect equipment for
damage and if damage is found, notify the
shipper promptly.
5. All NORTEC products are shipped on an
F.O.B. factory basis. Any and all damage,
breakage or loss claims are to be made
directly to the shipping company.
6. Each distributor is provided with: installation
manual, one hose cuff, and two hose
clamps.
PRE-INSTALLATION CHECK
1. Ensure the total capacity of the humidifier is
not higher than the allowable maximum
steam capacity of the distributors used.
ASD 10: 22 lbs/hr (8 kg/hr)
ASD: 25 lbs/hr (9 kg/hr)
BSD: 35 lbs/hr (13 kg/hr)
CSD: 115 lbs/hr (45 kg/hr)
STEAM LINE INSTALLATION
GUIDELINES
1. Nortec steam hose should only be used on
short steam runs below 10 feet.
2. Ensure that no condensate produced in the
steam line will remain trapped. Steam
naturally flows upward and condensate
naturally flows downward.
3. See material recommended for use in the
chart below. To eliminate the metal
corrosion, Nortec does not recommend the
use of steel piping.
Chart #1
Steam Line Material
Steam
Hose
Copper Tube Stainless
Steel Tube
Short run
< 10 feet
(3 m)
üü ü
Long run
> 10 feet
(3m)
üü
DI/RO
water
ü
4. Consult the following pages for step by step
distributor installation starting with Figure
#1.
5. Consult the charts below for steam and
condensate sizing guidelines when using
steam distributors.
Chart #2
Recommended material and size for steam run
-1-
lb/hr kg/hr ft m
0-30 0-13 0-10 0-3 Copper
tube
3/4" MED-L Tubing
(7/8" O.D.)
0-30 0-13 10 + 3 + Copper
tube
1” MED-L Tubing
(1 1/8" O.D.)
0-30 0-13 0-10 0-3 Stainless
Steel tube
7/8” tube x
0.049” thick.
0-30 0-13 10 + 3 + Stainless
Steel tube
1 1/8” tube x 0.049”
thick.
30-100 13-45 0-20 0-6 Copper
tube
1½”MED-LTubing
(1 5/8" O.D.)
30-100 13-45 20 + 6 + Copper
tube
2” MED-L Tubing
(2 1/8" O.D.)
30-100 13-45 0-20 0-6 Stainless
Steel tube
1 ¾” tube x
0.065” thick.
30-100 13-45 20 + 6 + Stainless
Steel tube
2” tube x
0.065” thick.
Load Steam Run Steam
Line
Material
Steam Line
Description
Please note that options shown in a bold-italic font requires
that reducers be used at both ends. These extra large sizes are to
allow for better condensation removal in long steam runs. These
sizes will not permit you to use hose coupling to connect your
self to either humidifier or distributors.

Chart #3
Recommended Condensate line at distributor(s)
CONDENSATE RETURN GUIDELINES FOR
MAIN STEAM LINES
1. Use vertical condensate leg of distributor
only. Do not over-tighten clamp.
2. Drip stations on steam mains must be
located at all low points in the system, at
each elevation change and or directional
change.
3. Horizontal runs of steam must have a 2”
rise per foot (10º) when flow is going
upwards from drip station and the steam
run is to fall ½” per foot (2º) when flow is
going downwards to drip station.
4. In a horizontal run of the steam main, drip
stations must be located at regular intervals
of 20 feet.
5. The drip station itself is a section of piping
connected to the bottom of the main. A full
size tee must be used to create a drip
station to allow the condensate to fall in the
drip station.
6. Vertical drop of the drip station should be
1.5 times the diameter of the steam main
but no less then 12”.
7. At the bottom of this drip station is where
the “p-trap” is installed. It is to be 2” larger
then the duct static duct pressure.
8. All distributors must be individually trapped.
-2-
Dispersion
Method
Condensate
Hose Copper tube Stainless Steel
tube
1 x Steam
distributor
3/8" Nortec
1328840
1/4" MED-L
Tubing
(3/8" O.D.)
3/8” tube
0.049” thick.
3 x Steam
Distributor*
3/8" Nortec
1328840
1/2" MED-L
Tubing
(7/8" O.D.)
5/8” tube
0.049" thick
*When using more than one distributor, the condensate line
should be trapped before joined together.
Full Size
Drain Tee
Figure #1
Drain Tee

-3-
NHB, NHP, NHMC,
RESDELUX ONLY
To be 2” (50mm) longer
then duct static pressure
or minimum.
To be 2” (50mm) longer
then duct static pressure
or minimum.
6”min(150mm)
12” (300 mm)
12”(300mm)
min. 2º min. 10º
Nortec
Humidifiers
All Models
min. 10º
C1 B
C1 B
6”min(150mm)
12” (300 mm)
Rmin.
12”(300mm)
min. 2º min. 10º
Nortec
Humidifier
min. 10º
Rmin.
Rmin.
min. 10ºmin. 2º
min. 20 %
min.
100%
Rmin.
min. 20 %
GO TO GO TO
GO TO GO TO
A
HORIZONTAL FLOW VERTICAL FLOW
NHB, NHP, NHMC,
RESDELUX ONLY
12” (300 mm)
12”(300mm)
6”min(150mm)
”min.(914mm)
6”min(150mm)
6”min(150mm)
6”min(150mm)
min. 10ºmin. 2º
12” (300 mm)
12”(300mm)
6”min(150mm)
12” (300 mm)
min. 10ºmin. 2º
12”(
300mm)
6”min(150mm)
min. 2º min. 10º
12” (300 mm)
Rmin.
12”(300mm)
min. 10º
min. 10º
min. 10º
Nortec
Humidifier
Nortec
Humidifiers
All Models
Nortec Humidifiers
All Models
Nortec Humidifiers
All Models
For long steam runs, condensate trap with full size tee, must
be used every 20 feet to eliminate condensate. Follow same
rulesasabovefortraphei
g
ht.
Use vertical
condensate leg
only.
Use vertical
condensate leg
only.
Use vertical
condensate leg
only.
Use vertical
condensate leg
only.
Use vertical
condensate leg
only.
Use vertical
condensate leg
only.
”min.(914mm)
”min.(914mm)
”min.(914mm)
12
”min.(914mm)
”min.(914mm)
12
12
12
12
12
Figure #2
Distributor Mounting

-4-
-45º
GO TO
1
2
3
C2
+45º
1x
B
Always align distributor holes so that steam is discharged
upwards to ensure condensate will remain in the distributor.
Figure #3
Vertical Airflow

-5-
C1
D
GO TO
¿3.6 mm
81-...
81-...
61-...
41-...
43mm
61mm
61-... / 41-...
¿3.6mm
81-...
61-.../41-...
H
X
XMin. HMin.
ASD 3” (76mm)
BSD
CSD
ASD ø 1.7" (43 mm)
BSD ø 1.7" (43 mm)
CSD ø 2.4" (61 mm)
4” (102mm)
5” (127mm) 14” (356mm)
8” (203mm)
10” (254 mm)
Template provided
by Nortec in box.
Always align distributor holes so that steam is discharged
upwards to ensure condensate will remain in the distributor.
H
2/3H
1/3H
1/5H
2/5H
2/5H
H
A
A
B
ASD: 5” 3”
BSD: 6” 4”
CSD: 9” 5”
AB
5”m in.
Figure #4
Horizontal Airflow

-6-
C2
D
GO TO
Always align distributor holes so that steam is discharged
upwards to ensure condensate will remain in the distributor.
H
1/3W 2/3W
W
1/3W1/3W 1/3W 1/3W
Min. W = 8” (203 mm)
Figure #5
Vertical Airflow
WARNING:
·These installation guidelines apply for duct velocities under 2000 ft/min (610 m/min), please consult factory
for higher velocities.
·Please make sure no obstacles (elbow, filter, or diffuser) are located after the distributor in the direction of the
airflow closer than the absorption distance calculated for your application.
·Unless you know the exact absorption distance required for the steam absorption into the air stream, the
distributor should be located at least 8-10 ft (2-3 m) away from any obstacle it may condense on (elbow,
diffuser, filter, etc.).

-7-
#10 Sc rew
Use self tapping screws.
GO TO E
D
Figure #6
Distributor Mounting - Horizontal & Vertical Flow
E
5/16”
5/16” unc
Support Bracke
t
by Others
Mandatory for Distributors longer than 36” (915mm).
Mount
Level
Figure #7
Distributor Mounting

-8-
ASD & BSD
1506162- Distributor End Cap Assembly
CSD
1506164 - Distributor End Cap Assembly
Distributor Core
Exploded Views
December 18, 2002
ASD & BSD
1506161- Distributor Inlet Assembly
CSD
1506163 - Distributor Inlet Assembly
Ce manuel convient aux modèles suivants
2
Table des matières