NATURE LOO Mini Mode d’emploi

®
Mini
Installation & Maintenance Manual
▪Thank you for purchasing the Mini. Please read this manual carefully before installation.
▪“Nature Loo” is a brand of Ecoflo Wastewater Management Pty Ltd.
▪ Visit our website at ecoflo.com.au
IMNL-002.190704 © Ecoflo Wastewater Management Pty Ltd

IMNL-002.190704 © Ecoflo Wastewater Management Pty Ltd Page 2
Copyright © 2019 Ecoflo Wastewater Management Pty Ltd
Please call your local distributor or Ecoflo Wastewater Management for support if required.
Ecoflo Wastewater Management Pty Ltd
www.ecoflo.com.au
www.natureloo.com.au
Phone: 1300 138 182
Phone: 07 3889 6144
Email: [email protected]
Proudly Designed and Assembled in Australia
by Ecoflo Wastewater Management

IMNL-002.190704 © Ecoflo Wastewater Management Pty Ltd Page 3
WHAT’S IN THE BOX? ..................................................................................................... 4
\INSTALLATION................................................................................................................ 5
Step 1: Choose a suitable site to install the toilet ..................................................................................5
Step 2: Installing the vent pipe & liquid drain.........................................................................................6
Step 3: Constructing the liquid drain trench...........................................................................................9
Step 4: Powering the fan .........................................................................................................................10
Mains Power ...............................................................................................................................10
Solar Power – refer to Solar Panel Installation Manual .........................................................10
Step 5: Assembling the collection chamber .........................................................................................11
CARE & MAINTENANCE................................................................................................ 11
EXCHANGING THE BIO BAG ........................................................................................ 12
COMPOSTING ACCELERATORS.................................................................................. 13
TROUBLE SHOOTING.................................................................................................... 14
PRODUCT & COMPONENT WARRANTY...................................................................... 15
APPENDIX 1.................................................................................................................... 16
Table of Content

IMNL-002.190704 © Ecoflo Wastewater Management Pty Ltd Page 4
WHAT’S IN THE BOX?
Please check the packing slip to ensure everything has been delivered.
If anything is missing, please notify your supplier immediately.
Items you will need to complete your installation:
100mm (DWV) PVC Pipe (ventilation):
Enough length/meters to rise 600mm above the roof line.
N.B. This height is very important for venting.
2 x 100mm (DWV) PVC 45 degree bends
The bends divert the vent pipe around the roof gutter/awning.
Or 1x 100mm roof dektite
Allows a water proof seal if the vent goes through the roof.
Brackets/pipe clips to hold the vent pipe to the outside wall:
2 or 3 depending on the height to the length of pipe
100mm slotted agricultural or drilled PVC pipe: 2m
Additional 19mm polypipe (liquid drain hose): Enough meters to reach the absorption trench
Aggregate/Gravel (~25mm grade): 0.3m3
Hessian or plastic geotextile material: 2m x 0.4m

IMNL-002.190704 © Ecoflo Wastewater Management Pty Ltd Page 5
INSTALLATION
Step 1: Choose a suitable site to install the toilet
The toilet must also be locat-
ed close to a power source.
E.g.
/
The location of the toilet must have both:
1. Easy access to connect the fan system to a permanent vent pipe up the outside of the structure.
The vent pipe from the toilet exits horizontally through the wall behind the toilet.
2. An elevated starting point for liquid to flow by gravity from the toilet down into a liquid absorption
trench which is to be dug outside the toilet room.

IMNL-002.190704 © Ecoflo Wastewater Management Pty Ltd Page 6
Step 2: Installing the vent pipe & liquid drain
After selecting the toilet’s location, fit the Wallace
Grommet to the back of the fibreglass shell. Push
the shell flush against the wall (in the correct position
& alignment). Mark a circle on the wall through the
Wallace Grommet & Liquid Drain Hole as a guide.
Move the Shell away from the wall.
Prepare to drill suitable holes to ac-
commodate the 19mm liquid drain
hose and the 50mm PVC Pipe. Use
these pipes to accurately mark the
diameters on the wall.
Wallace
Grommet
Liquid Drain Hole
Hose removed
Using the circles drawn on the wall as a guide, cut a hole of sufficient size to allow the 50mm pipe
to push through the wall and a second hole (approximately 25mm) for the liquid drain hose.
Push the 50mm PVC pipe length
provided into the ‘T’ piece and then
insert the 50mm PVC pipe through
the wall until the ‘T’ piece is flat
against the wall.
50mm PVC
Pipe

IMNL-002.190704 © Ecoflo Wastewater Management Pty Ltd Page 7
Wall
Wallace
Grommet 50mm PVC
Pipe
Insert the 50mm PVC pipe from
the wall into the Shell through
the Wallace Grommet and push
Shell to its chosen position. If
the PVC pipe protrudes too far
into the shell [fouling the 20L
bin], mark & trim the pipe to
allow free air movement.
Shell
Not supplied

IMNL-002.190704 © Ecoflo Wastewater Management Pty Ltd Page 8
Option 2
Option 1
PVC pipe components, except the push on cap at the base of the ‘T’ piece (i.e. the Moisture
Trap), should be glued together using Plumbers PVC glue.
Connect the supplied Sewer Vent Cap to the top of the vent pipe,
and then the bottom of the vent pipe into the moisture trap.
Install the 100mm PVC pipe as per Option 1 or Option 2 (pictured above). If possible, Option 1
is far better for ventilation as the two 45 degree elbows in Option 2 can slow the air flow. Use
pipe clips (not provided) to secure the 100mm pipe to the outside wall.
Once the toilet is permanently
connected to the ‘T’ piece you
may attach the fibreglass toilet
shell to the floor with the self-
tapping screws and nylon
washers (supplied) and / or a
sealant (not supplied).
Pre-Drill Clearance Holes in the Shell floor; so the screws do not
stress the fibreglass shell.

IMNL-002.190704 © Ecoflo Wastewater Management Pty Ltd Page 9
Step 3: Constructing the liquid drain trench
Place the plain end of the 19mm
Liquid Drain Hose through the
small hole in the rear of the fibre-
glass toilet shell. Feed the hose
through until the liquid drain valve
connection side is resting just on
the inside of the shell near the
front edge.
The hose exiting through the hole
in the shell should lead through
the hole previously cut into the
bathroom wall and out towards
the absorption trench.
Wall
Shell
Liquid Drain Hose
50mm PVC
Pipe
Wallace
Grommet
Construct the excess liquid drain absorption trench as per the following diagrams.
Also note that the liquid drain hose when installed must always allow the liquid to
continuously run downhill.

IMNL-002.190704 © Ecoflo Wastewater Management Pty Ltd Page 10
Step 4: Powering the fan
Mains Power
A 240/12 volt regulated transformer is included to run the fan from mains power. Connect the
fans to the transformer as follows:
We recommend a spare fan is kept on hand at all times, particularly after a year of use.
Go to Ecoflo Online Store or call 1300 138 182 for replacement or spare fans.
Solar Power – refer to Solar Panel Installation Manual
Table des matières
Autres manuels NATURE LOO Toilettes
Manuels Toilettes populaires d'autres marques

Better Bathrooms
Better Bathrooms BUN/BeBa 27555/78725 Manuel utilisateur

American Standard
American Standard CONCEPT Cube TF-2704 Manuel utilisateur

BIOLAN
BIOLAN ECO Manuel de la liste des pièces

Thetford
Thetford C260 Series Manuel utilisateur

KELISS
KELISS T162A Series Manuel utilisateur

Kohler
Kohler K-22241K Instructions de montage
















