MSTRONIC MSE PSE-SW3G Manuel utilisateur

USER’S MANUAL
MSTRONIC CO., LTD.
MSE PSE-SW3G
3 Port PoE Switch & Extender
(Repeat Ethernet and PoE)

User’s Manual
MSE PSE-SW3G series
MSTRONIC CO., LTD.
2
1. General Information..............................................................
2. Hardware Description...........................................................
LED Indicators.......................................................................................
Power Wiring ........................................................................................
Ethernet Port Wiring..............................................................................
PD Port Wiring......................................................................................
Network Application……………………………………............................
3. Model Information...........................................................
4. Technical Specification........................................................
3
3
3
5
8
10
11
12
13

User’s Manual
MSE PSE-SW3G series
MSTRONIC CO., LTD.
3
1. General Information
The PoE (Power Over Ethernet) Switch family provide two 10M/100M/1000M TX ports with PoE
PSE function plus one 10M/100M/1000M TX up-link port with PoE PD function. It allow powered
from PoE power souring equipment (PSE) and deliver power to PoE powered device (PD), which is
compliant with IEEE802.3af and IEEE802.3at standard to receiver and deliver both of Ethernet data
and DC power through the traditional UTP or STP cable. The PoE Switch can extend Ethernet data
and DC power up to 200 meters.
This manual will help you install and maintain the PoE switch.
Installation of the PoE switch is very easy and you will begin to operate as soon as you are powered
up.
2. Hardware Description
*LED Indicator
There are 8 LEDs on the PoE switch to indicate the status of power and signal. The following
section describes the functions of each LED indicator.
Front panel detail

User’s Manual
MSE PSE-SW3G series
MSTRONIC CO., LTD.
4
*POWER LED
LED
STATUS
Description
Power
Green
LED ON when power input (DC IN on
rear panel or Port UPLINK on front
panel) has valid power supplied.
Red
The indicator only been used on
PSE-SW3G11CN, LED ON when the
following warning condition happened.
*Power input under voltage (Vin<10V)
*Power input over voltage (Vin>59V)
*PoE over current (2A/per port)
the indicator is unused on
PSE-SW3G44DN
Off No power supplied.
*SWITCH LED (the right indicator on RJ45)
LED STATUS Description
P1~P3
Link/Act
Green
A network device is detected (1000Mbps),
but no communication activity is detected.
Green
Blinking
This port is transmitting to, or receiving
package from another device at 1000Mbps.
Yellow A network device is detected (10Mbps or
100Mbps), but no communication activity
is detected.
Yellow
Blinking
This port is transmitting to, or receiving
package from another device at 10Mbps or
100Mbps.
Off No device is detected.

User’s Manual
MSE PSE-SW3G series
MSTRONIC CO., LTD.
5
*PoE LED (the left indicator on RJ45)
P1~P2
PoE
Yellow
A valid Powered Device (PD) is detected
and delivering power on this port.
Off
No PD is detected on this port.
P3
PoE
Yellow
Powered via all 4 data pairs.
Yellow
Blanking
Powered via 2 data pairs. (1,2,3,6 or 4,5,7,8
are all acceptable).
Off No power is detected on this port.
*Power wiring
The PoE switch family includes 2 models, be used for 2 different ranges of input voltage as,
full range voltage (10 to 57VDC) (P/N: PSE-SW3G11CN)
48VDC typical (40 to 57VDC) (P/N: PSE-SW3G44DN)
All of the PoE switches allow powered by another PoE source (42.5~57VDC) on port 3 (UPLINK).
For PoE operation, make sure your power supply may offer at least 40W for 2x 802.3af PoE port, or
80W for 2x 802.3at PoE port.
If powered on rear terminal, please make sure the input current don’t over 10A, if powered on port
3, make sure the input current don’t over 2Amp.
The port 1&2 will deliver DC power over the Ethernet cable, the connection as:
* Data pair A on line 1 and 2
* Data pair B on line 3 and 6
* Data pair C plus V+ on line 4 and 5
* Data pair D plus V- on line 7 and 8

User’s Manual
MSE PSE-SW3G series
MSTRONIC CO., LTD.
6
The port 3 may get DC power over the Ethernet cable, the connection as:
* Data pair A plus V+ /V- on line 1 and 2
* Data pair B plus V-/V+ on line 3 and 6
* Data pair C plus V+/V- on line 4 and 5
* Data pair D plus V-/V+ on line 7 and 8
The terminal block on rear panel should be wiring as:
*For PSE-SW3G44DN
The input voltage must be in the range of 40 to 57VDC if running for 802.3af operation.
The input voltage must be in the range of 50 to 57VDC if running for 802.3at operation.
If the PSE-SW3G44DN is not powered in above designated input voltage, it will only functioning
as an Ethernet switch without PoE output.

User’s Manual
MSE PSE-SW3G series
MSTRONIC CO., LTD.
7
Model Input Voltage
(REAR) Input Voltage
(Port 3) Output voltage 802.3af/at
Isolated
PSE-SW3G11CN
10-57VDC No input
10-57VDC
(As input voltage)
(non-regulated) No No
No input 42.5-57VDC 42.5-57VDC
(non-regulated) No No
10-57VDC 42.5-57VDC
Higher voltage
output
(REAR or Port 3)
No No
PSE-SW3G44DN
40-57VDC No input 40-57VDC
(non-regulated) Yes No
No input 42.5-57VDC 42.5-57VDC
(non-regulated) Yes No
40-57VDC 42.5-57VDC
Higher voltage
output
(REAR or Port 3)
Yes No
You could use the PSE-SW3G series with our adaptor products as the below: (OPTION)
MS-A150-18-1 MS-A150-24-1 MS-A150-48-1
Maximum output 18VDC/7.5A 24VDC/6.25A 48VDC/3.125A
Related model PSE-SW3G11CN
PSE-SW3G11CN
PSE-SW3G11CN
PSE-SW3G44DN

User’s Manual
MSE PSE-SW3G series
MSTRONIC CO., LTD.
8
*Ethernet Port Wiring
The PoE switch family supports one RJ-45 uplink (port 3 with PoE PD) and two RJ-45 ports (port
1&2 with PoE PSE) with automatic MDI/MDI-X crossover, auto-sense the speed and duplex for
10Base-T, 100Base-TX or 1000Base-T connection. Automatic MDI/MDI-X crossover allows you
to connect to other devices (switches, hubs, or workstations etc.), without regard to using
straight-through or crossover cabling.
Port 1 & 2 provides Power over Ethernet function that delivers DC power through the data pairs C
& D (pair 4,5 and pair7,8) to the PD. Port 3 provides Power Device (PD) function that receive
power from 4 pairs or 2 pairs Ethernet cable.
The following tables describe the wiring diagram of straight-through and crossover cabling. That
crossover cables simply cross-connect the transmit lines at each end to the receive lines at the
opposite end.
Straight-through Cabling
Pin 1
Pin 1
Pin 2
Pin 2
Pin 3
Pin 3
Pin 6
Pin 6
Pin 4
Pin 4
Pin 5
Pin 5
Pin 7
Pin 7
Pin 8
Pin 8

User’s Manual
MSE PSE-SW3G series
MSTRONIC CO., LTD.
9
Cross-over Cabling
Pin 1
Pin 3
Pin 2
Pin 6
Pin 3
Pin 1
Pin 6
Pin 2
Pin 4
Pin 7
Pin 5
Pin 8
Pin 7
Pin 4
Pin 8
Pin 8
Connect an Ethernet cable into any switch port and connect the other side to your
attached device. The Link/Act LED (green or yellow) will light up when the cable is correctly
connected. Refer to the LED Indicator section for descriptions of each LED indicator.
If a port LED is off, go back and check for connectivity problems between that port and the network
device connected.
The maximum cable length for 10/100/1000BaseT with Cat 5 twisted pair cables is typically 100m
(328 ft.).

User’s Manual
MSE PSE-SW3G series
MSTRONIC CO., LTD.
10
*PD Port Wiring
Port 1 & 2 provide PoE inject function with maximum 35W ability to power up the powered device
use the straight-through or cross-over Ethernet cable.
The PoE switch follows the IEEE802.3af Alternative B mode connector assignment. The following
table shows pin assignment of alternative A and B for the Power Source Equipment.
Conductor Alternative A
(MDI-X) Alternative A
(MDI) Alternative B
(All)
1Negative Vport Positive Vport
2 Negative Vport Positive Vport
3 Positive Vport Negative port
4 Positive Vport
5 Positive Vport
6 Positive Vport NegativenVport
7 Negative Vport
8 Negative Vport
Be sure the twisted pair cable is bound with the standard RJ-45 pin, especially the pin 4, 5, 7 and 8.
If the RJ-45 is bound with the wrong pin number, PoE switch will not recognize the PD and won’t
deliver DC power to PD. The yellow PoE LED will light up when the cable is correctly connected.
Refer to the LED Indicator section for descriptions of each LED indicator. If a port LED is off, go
back and check for connectivity problems between that port and the network device connected.
Autres manuels pour MSE PSE-SW3G
1
Table des matières
Autres manuels MSTRONIC Extenseur


















