
40417 Instruction Sheet
© Ikonix 4
Connected the 9 Pin DSUB assembly to the Signal Output port of the test instrument. Run a test to verify the test is in process, the
PROCESSING bit will be active, and the red signal light will illuminate and ash. This indicates that the testing station is not safe to
approach. When the test completes with a PASS, the green light will illuminate.
VERIFY
Assemble shrink tube onto the wires, as illustrated in Figure 4.
a. Slide 1st tube over all wires.
b. Slide 2nd tube through Red, Green, Black, and Grey wires that will connect to DB9 connector.
c. Slide 3rd tube through two brown wires that will be connected to 24 Volt supply.
d. Unused wires should be properly cut and placed under the tube.
e. DO NOT shrink the tube until after the steps for soldering and power connections.
HEAT SHRINK TUBING (Optional - Tubing Not Included)
To DB9 Connector
To 24 V Supply
5
4
Use a heat gun to shrink the tubing until it is tightly secured on to the wires. Avoid damaging the wires by not overheating any one
spot on the shrink tube or the wire. Heat the heat shrink tube to form an overlapping Y shape at the junction.
HEAT (Optional)
6