
STEP 1 LAYOUT AND
PREPARATION
Mark areas where KnuckleHeads
will be positioned. For best results,
clean roof membrane with alcohol to
maximize adhesion of GREEN LINK
Adhesive/Sealant.
SOLAR KNUCKLEHEAD INSTALLATION GUIDE
5519 E Cork St, Kalamazoo, MI 49048 | www.greenlinkengineering.com | 888.672-9897
STEP 2 AT TACHING
BASE
Apply GREEN LINK Adhesive/Sealant
to Universal Base and press onto
membrane surface. Use mechanical
fasteners to attach base directly to roof
deck.
STEP 3 SEALING BASE
PERIMETER
Once base in pressed into place, apply
GREEN LINK Adhesive/Sealant around
the base perimeter.
STEP 4 INSTALLING
EXTENSION
Slide extensions into base.
STEP 5 INSTALLING
FLASHING BOOT
Slide boot over extension and press
to membrane.
STEP 6 SEALING BOOT
PERIMETER
Follow manufacturer’s instructions
for sealing boot using heat welding
and or GREEN LINK Adhesive/
Sealant.
STEP 7 INSTALLING
HEAD
Mate solar head to extension.
Adjust for height by rotating head.
STEP 8 CHANGING
(OPTIONAL) ANGLE
If other than a 15-degree angle is
desired, position Solar Wedge into
head to either increase or decrease
angle.
STEP 9 INSTALLING
CHANNEL
Fit 1 5/8” x 1 5/8” channel into
heads, in linear and elbow
conguration. Attach channel with
standard bolts.
STEP 10 AT TACHING
PANEL
Mount panels on channel and bolt
into place.