Grant-bio ES-20 Manuel utilisateur

Operating instructions
Shaker-Incubator
ES-20
For version V.2GD

Page 2 ES-20
Operating instructions
Version 2.02 - July 2013

Page 3
Contents
1 Safety ...........................................................................................4
2 General Information....................................................................5
3 Getting Started ............................................................................6
4 Operation of ES-20......................................................................7
5 Specifications..............................................................................9
6 Guarantee and service..............................................................10
7Declaration of Conformity ........................................................11
ES-20
Operating instructions Version 2.02 - July 2013

Page 4
The following symbols mean:
Caution! Make sure you have fully read and understood the present operating
instructions before using the equipment. Please pay special attention to
sections marked by this symbol.
GENERAL SAFETY
Use only as specified in the operating instructions provided.
The unit should not be used if dropped or damaged.
The unit must be stored and transported only in an horizontal position (see marking on the
package).
After transportation or storage keep the unit under room temperature for 2–3 hrs before
connecting it to the electric circuit.
Use only cleaning and decontamination methods recommended by the manufacturer.
Do not make modifications in design of the unit.
ELECTRICAL SAFETY
Connect only to electric circuit with voltage corresponding to that on the serial number label.
Ensure that the electric circuit switch and the plug are easily accessible during use.
Disconnect the unit from the electric circuit before moving.
Disconnect the power cord plug from power socket to turn off the unit.
After moving the unit check the shaker control cable connections.
Do not plug the unit into an ungrounded the power socket, and do not use an ungrounded
extension lead.
If liquid penetrates into the unit, disconnect it from the electric circuit and have it checked by a
repair and maintenance technician.
1. Safety
ES-20
Operating instructions
Version 2.02 - July 2013

Page 5
ES-20
Operating instructions
DURING OPERATION
Do not impede the platform motion.
Do not operate the unit in premises with aggressive or explosive chemical mixtures.
Do not disconnect the shaker control cable when the unit is switched on.
Do not operate the unit if it is faulty or has been installed incorrectly.
Do not use outside laboratory rooms.
Do not place a load exceeding the maximum load value mentioned in the specifications section
of these operating instructions.
BIOLOGICAL SAFETY
It is the user's responsibility to carry out appropriate decontamination if hazardous material is
spilt on or penetrates into the equipment.
Version 2.02 - July 2013

2. General Information
The ES-20 is a compact desktop shaker-incubator used for mixing of biological liquids as well as
incubation and cultivation of biological liquids according to the program set by the operator.
Built-in microprocessor thermocontroller provides constant temperature control in the incubator
chamber. Forced heated air circulation inside the transparent plexiglass chamber guarantees even
temperature distribution. Dismountable construction makes transportation easy.
Orbital shaking is controlled by the digital tachometer (rpm) and digital timer regardless of the
temperature. The unit is equipped with the direct-drive system ensuring most reliable stable long-time
operation (up to 30 24 hour cycles).
The ES-20 is easy to operate. The two-line LCD display shows both set and actual values for
temperature, time and speed.
The device consists of a thermal regulator and control block, shaking block and a plexiglass
chamber.
The following elements are located on the front panel:
-power switch (fig.1/ );
-display (fig.1/ );
-control buttons (fig.1/ ).
The following elements are located on the rear panel:
-shaking block control cable (fig.1/ );
-socket for connecting the power cord (fig.1/ );
Fig.1 Unit construction
Page 6 ES-20
Operating instructions
Version 2.02 - July 2013

Page 7
ES-20
Operating instructions
- ).
Five interchangeable platform types allow using the shaker for:
-growing cell cultures in flasks and other laboratory glassware;
-extracting tissue samples at physiological temperatures;
-other sample preparation processes.
The unit is applicable in all the areas of clinical, biotechnology and microbiology laboratory
research.
fuse holder (fig.1/
Version 2.02 - July 2013

Page 8 ES-20
Operating instructions
u PUP-12 v PP-4 w P12-100
y P16-88 z HB-200
3. Getting started
3.1 Unpacking
Remove packaging carefully, and retain them for future shipment or storage of the unit
Examine the unit carefully for any damage incurred during transit. The warranty does not
cover in-transit damage.
3.2The ES-20 set includes
• Shaker-Incubator ES-20 ....................................................................................1 piece
• Power cord..........................................................................................................1 piece
• Control cable.......................................................................................................1 piece
• Spare fuse ..........................................................................................................1 piece
• Operating Instructions; Declaration of Conformity..................................................1 copy
• ES-20 Shaker-Incubator Assembling Instruction ...................................................1 copy
Optional accessories:
·PUP-12 platform u........................................................................................on request
·PP-4 platform v.............................................................................................on request
·P12-100 platform w.......................................................................................on request
·P6-250 platform x.........................................................................................on request
·P16-88 platform y.........................................................................................on request
·HB-200 holding bar z....................................................................................on request
x P6-250
Version 2.02 - July 2013

Page 9
ES-20
Operating instructions
3.3. Set up:
-Assemble the unit using the enclosed ES-20 Orbital Incubator Shaker Assembling
Instruction as a guide;
Note! ES-20 Orbital Incubator Shaker Assembling Instruction can be found on our web
page, please visit the link http://distributor.grant.co.uk/
media/19989/assembling%20ES-20_en6_19102012.pdf.
-Place the unit on a horizontal even working surface;
-Remove protective film from the display;
-Connect the shaker control cable (fig.1/x) into the corresponding sockets on the rear
of the thermostatic and shaking blocks;
-Plug the mains cable into the socket on the rear (fig.1/y) and position the unit so that
there is easy access to the power switch and connector.
3.4. Platform installation:
Install the platform by inserting the pins on the bottom side of the platform into the holes
on the supporting platform on the shaker.
Note! Move the unit carefully and only in a vertical position.
Version 2.02 - July 2013

Page 10 ES-20
Operating instructions
4. Operation of ES-20
4.1. Connect the unit to a grounded power socket. Set the Power switch to position I (ON).
4.2. The display will turn on with the upper line (Set p.) showing the previously set time, speed
and temperature and the lower line (Actual p.) showing current readings of the same
parameters (STOP – time, 000 – rpm, incubator temperature °C, which automatically starts
rising according to the temperature set in the upper line).
Setting the parameters
Use the readings in the upper line of the display (Set p.), while setting the parameters
required.
Setting time (Time)
4.3. Using the p and q Time keys (Fig. 2/u) set the required working time interval in hours and
minutes (increment - 1 min). Pressing the key for more than 3 sec will increase the increment.
Setting speed (RPM)
4.4. Using the p and q RPM keys (Fig. 2/v) set the required shaking speed (increment 10
RPM). Pressing the key for more than 3 sec will increase the increment.
Setting temperature(Temp.ºC)
4.5. Using the p and q Temp. keys (Fig. 2/w) set the required temperature (increment 0.1ºC).
Pressing the key for more than 3 sec will increase the increment.
Fig.2 Control panel
Shaker
Timer
Time RPM Temp.
PROCEEDING PARAMETERS SET PARAMETERS
Time (hr : min) RPM Temp. °C
Set p.
Actual p. Run/Stop
STOP 000 +37.0
+37.0
160 00:25
Version 2.02 - July 2013
Table des matières

















