
2EATON IB528002EN Installation instructions rev 20171011
Installation Instructions - Stadium Series
ote:N Charge the provided laser battery before installation begins.
Required Materials & Tools
TABLE OF CONTENTS
Safety Instructions .................................................................................................................................................................1
Required Materials & Tools ....................................................................................................................................................2
Supply Power Specifications..................................................................................................................................................2
Installation..............................................................................................................................................................................4
Step 1 – Mount the Luminaires .........................................................................................................................................4
Step 2 – Label the Luminaires (If Required).......................................................................................................................6
Step 3 – Make Electrical Connections ...............................................................................................................................7
Step 4 – Aim the Luminaires..............................................................................................................................................9
Step 5 – Finishing Touches ...............................................................................................................................................13
Care and Maintenance .........................................................................................................................................................14
Troubleshooting....................................................................................................................................................................14
Required Material: For more information refer to Section:
Mounting Hardware (3/4” mounting bolt, 2 matching
flat washers, 1 matching nut)
Step 1 - Mount the Luminaires
Electrical splicing connectors Step 3 – Make Electrical Connections
Cable ties or wire management Step 4 – Aim the Luminaires
Required Tools Installer shall provide For more information refer to Section:
Socket wrenches and/or crescent wrenches sized to
fit mounting hardware (3/4” for mounting)
Step 1 - Mount the Luminaires
DMX Tester/RDM Controller Step 3 – Electrical Connections
15/16” socket driver for hex bolt Step 4 – Aim the Luminaires
Torque wrench rated to a minimum of 35 ft-lbs Step 4 – Aim the Luminaires
Torque driver with 3/16” hex bit rated to a minimum
of 35 in-lbs
Step 4 – Aim the Luminaires
Calibrated light meter Step 4 – Aim the Luminaires
Tools Provided by Ephesus For more information refer to Section:
Aiming Laser Step 4 – Aim the Luminaires
Aiming Mount Step 4 – Aim the Luminaires
Storage Temperature Operating Temperature Humidity
-40°C to +75°C (-40°F to 167°F) -40°C to +55°C (-40°F to 131°F) 5% to 95% non-condensing
Store luminaires in a clean, dry place, protected from dirt, water, and sunlight. See Table 1 for required storage and operating
conditions:
Table 1. Storage and Operating Conditions
Supply Power Specifications
Ephesus LED light fixtures are not traditional incandescent lights, they are high-tech, new generation solid-state devices.
To protect your valuable investment, the electrical power shall be clean and have stable voltage and current and undistorted
waveforms.