
EN
Installation instructions BHS 55215 English, 170906
BHS cables with a length of 3.3 m (E 89 604 97) are used predominantly when casting pillars. Four
cables are placed in this case.
The BHS system can also be used to heat building structures, assuming they have been correctly
insulated. As heat accumulates in concrete, it is advantageous to connect the system up only at
night when the electricity rates are favourable. The temperature is controlled via the thermostat
of the central BHS unit (item no. 2466233) which also has a timer function.
Heating
If the system is used for drying, the cables must be connected pair-wise in series, so that only
a quarter of the output is utilised. The series connection adapter (art no. 2403033) allows this to
be done in a simple way.
Drying
Cable length Effect Voltage
2x85 m 1750 W (875 W/cable) 230 V
2x55 m 1100 W (550 W/cable) 230 V
2x35 m 700 W (350 W/cable) 230 V
2x20 m 370 W (185 W/cable) 230 V
2x10 m 35 190 W (95 W/cable) 230 V
Effect when drying out concrete
Article number Article Lenght Effect Connection plug
E 89 604 90 BHS 85 m 3500 W Cee-don
E 89 604 96 BHS 85 m 3500 W Schuko
E 89 604 91 BHS 55 m 2200 W Schuko
E 89 604 92 BHS 35 m 1400 W Cee-don
E 89 604 93 BHS 35 m 1400 W Schuko
E 89 604 94 BHS 20 m 735 W Schuko
E 89 604 95 BHS 10 m 380 W Schuko
E 89 604 97 BHS 3,3 m 130 W Schuko
E 89 605 41 Spiral hose 2,5 m
E 24 662 33 BHS Central
E 24 030 33 BHS Serial connection adapter
EBEC
O
AB,
Lärjeågatan
11,
SE-
415
25
Göteborg,
Sweden,
+46
(0)
31-707
75
50,
[email protected],
w
ww.ebeco.com