DigiPower IPP-S Series Manuel utilisateur

Digipower Inc.
2017
Digipower Inc.
2017/5/5
Intelligent Power Panel with Switch
Installation Guide

IPP-S Installation guide Digipower Inc.
Table of Content
Installation Diagram.....................................................................................................................1
Faceplate Functional Description.........................................................................................1
1P3W installation Diagram ..................................................................................................2
3P3W installation Diagram ..................................................................................................3
3P4W installation Diagram ..................................................................................................4
Digital Input Wiring Diagram ...............................................................................................5
Digital Output Wiring Diagram.............................................................................................5
Installation Notes.................................................................................................................5
Operation .....................................................................................................................................6
Normal Mode.......................................................................................................................6
Brightness adjusting.............................................................................................................6
Show IP address ...................................................................................................................7
1P3W/3P3W/3P4W setting .................................................................................................7
Test Mode setting.................................................................................................................7
Load setting..........................................................................................................................8
Meter ID setting ...................................................................................................................8
Meter Series Number setting...............................................................................................9
Technical Specification .................................................................................................................9
Web interface.............................................................................................................................11
Information ........................................................................................................................12
Management......................................................................................................................14
Configuration......................................................................................................................20
Mobile app .................................................................................................................................25

IPP-S Installation guide Digipower Inc.
1
Installation Diagram
Faceplate Functional Description

IPP-S Installation guide Digipower Inc.
2
1P3W installation Diagram
Notes:
1. The figure Shows 110V / 220V 1P3W power supply system used in the general household.
2. N stand for Neutral, L1-N and L2-N are 110V, L1-L2 is 220V.
3. C1, C2 detect power source. C3, C4 and C5, C6 and C7, C8 detect 220V. C9~C12 detect 110V.
4. In the measurement of 1P3W power consumption, the N as the reference point, with two wattmeter measurement, measure
the voltage between L1-N with current L1, L2-N with current L2. C1 detects L1 current on L1-N, C2 detects L2 current on L2-N.
The rest C3, C4, or, C5, C6 or C7, C8 can be done in the same manner.
5. The Formula and define of 1P3W synthesized as follows:
VAVG(Average voltage)=(V1+V2)
PFEQ(equivalent PF)=WT/VAT
IEQ(equivalent current)=VAT/VAVG
KWHT(TOTAL KWH)=KWH1+KWH2
WT(TOTAL W)=W1+W2
VAT(TOTAL VA)=VA1+VA2
KVAHT(TOTAL KVAH)=KVAH1+KVAH2
6. C9, C11 detect L1 current on L1-N separately. C10, C12 detect L2 current on L2-N separately.

IPP-S Installation guide Digipower Inc.
3
3P3W installation Diagram
Notes:
1. L1-L2, L2-L3 and L3-L1 are 220V. The figure shown C1, C2, C3 detect 3P3WΔtype total power source, C4, C5, C6 and C7, C8, C9
detect the other two 3P3W power. C10, C11 and C12 detect the one of three phases separately.
2. In the measurement of 3P3W power consumption, the L2 as the reference point, with two wattmeter measurement, measure
the voltage between L1-L2 with current in L1 and L3-L2 with current in L3 to get 3P3W power consumption.
The figure shown C1 detects L1 current, the voltage is L1-L2.
The figure shown C2 detects L2 current, the voltage is L3-L1.
The figure shown C3 detects L3 current, the voltage is L2-L3.
3. The Formula and define of three-phases four-wires synthesized as follows:
VAVG(Average voltage)=(V1+V3) /2
PFEQ(equivalent PF)=WT/VAT
IEQ(equivalent current)=VAT/VAVG
KWHT(TOTAL KWH)=KWH1+KWH3
WT(TOTAL W)=W1+W3
VAT(TOTAL VA)=VA1+VA3
KVAHT(TOTAL KVAH)=KVAH1+ KVAH3
4. The figure shown C10 detects L1 current, the voltage is L1-L2.
The figure shown C11 detects L2 current, the voltage is L2-L3.
The figure shown C12 detects L3 current, the voltage is L3-L1.

IPP-S Installation guide Digipower Inc.
4
3P4W installation Diagram
Notes:
1. VL1-N = VL2-N = VL3-N , VL1-L2 = VL2-L3 = VL3-L1 = √3 * VL1-N=380V
2. The figure shows C1, C2 and C3 detect 3P4W Y type power source. C4~C12 detect phase to Neutral.
3. In the measurement of 3P4W power consumption, the N as the reference point, with three wattmeter measurement, measure
the voltage between L1-N with current in L1, L2-N with current in L2 and L3-N with current in L3 to get 3P4W power
consumption.
The figure shown C1 detects L1 current, the voltage is L1-N.
The figure shown C2 detects L2 current, the voltage is L2-N.
The figure shown C3 detects L3 current, the voltage is L3-N.
4. The Formula and define of three-phases four-wires synthesized as follows:
VAVG(Average voltage)=(V1+V2+V3) /3 PFEQ(equivalent PF)=WT/VAT
IEQ(equivalent current)=VAT/VAVG KWHT(TOTAL KWH)=KWH1+KWH2+KWH3
WT(TOTAL W)=W1+W2+W3 KVAHT(TOTAL KVAH)=KVAH1+KVAH2+KVAH3
VAT(TOTAL VA)=VA1+VA2+VA3
5. The figure shown C4, C7, C9, C12 detect L1 current, the voltage is L1-N.

IPP-S Installation guide Digipower Inc.
5
The figure shown C5, C8, C10 detect L2 current, the voltage is L2-N.
The figure shown C6, C11 detect L3 current, the voltage is L3-N.
Digital Input Wiring Diagram
Power Supply:
12 Vdc 0.8A
Input:
Channel Isolated
Range : Contact open(off) or closed (on)
Termination Connection:
14~28AWG,0.2~15mm2
Digital Output Wiring Diagram
Output:
Range : Contact open(off) or closed (on)
Max. switching current: 16A
Max. switching voltage: 250VAC
Max. switching capacity: 4000VA
Termination Connection:
12 ~30AWG,0.2~4mm2
Installation Notes
1. The maximum voltage measurement is 400V.
2. Check that the voltage and current phases are connected properly.
3. Measuring the diameter of the conductor (the bare wire) with the insulation removed and selecting the suitable size of
detachable CT.
4. Measuring voltage: Make sure the CT’s on phases and wires are correct as installation diagram.
5. Measuring current: The positive output can be obtained when the direction of current carrying conductor is the same as the
direction of arrow marked on the CT.
6. The installation of loads combination refers to Installation Diagram.
7. The hardware setting refers to Installation Diagram.
8. Working power supply: AC 115V/230V on terminal R & T, the pinout as shown in Installation Diagram.
9. The software setting refers to Operation.
10. Communication interface: RJ-45, TCP/IP

IPP-S Installation guide Digipower Inc.
6
Operation
Normal Mode
Item
Key
Description
1.1
or
Show Loops and CT combination.
1.2
Display the following items:
(1) kW (2)kWh (3)V (4)I (5)PF
1.3
+
Pressed 3 seconds simultaneously, enter Meter ID setting Mode.
1.4
+
Pressed 3 seconds simultaneously, enter Brightness adjusting Mode, show version
number and IP address.
1.5
+
Pressed 3 seconds simultaneously, enter 1P3W/3P3W/3P4W setting Mode.
1.6
+
Pressed 3 seconds simultaneously, enter Test Mode.
1.7
+
Pressed 3 seconds simultaneously, enter Load setting Mode.
1.8
+
Pressed 3 seconds simultaneously, enter Meter Series Number setting Mode.
Brightness adjusting
In this mode, adjust LED brightness from 1 to 9.
Item
Key
Description
2.1
Increase
2.2
Decrease
2.3
One click enters Show IP address mode.
Pressed 3 seconds return to Normal Mode.
2.4
Pressed 3 seconds to save then return to Normal Mode.

IPP-S Installation guide Digipower Inc.
7
Show IP address
In Brightness adjusting mode, pressed enter Show IP address mode.
Item
Key
Description
2.1
Previous segment display
2.2
Next segment display
2.3
One click enters Brightness adjusting mode.
Pressed 3 seconds return to Normal Mode.
2.4
Pressed 3 seconds to save then return to Normal Mode.
1P3W/3P3W/3P4W setting
In this mode, select 1P3W/3P3W/3P4W in accordance with wires installation.
Item
Key
Description
3.1
or
Select 1P3W/3P3W/3P4W
3.2
Pressed 3 seconds return to Normal Mode.
3.3
Pressed 3 seconds to save then return to Normal Mode.
Test Mode setting
In this mode, inspect each CT information.
Item
Key
Description
4.1
or
Select CT number
4.2
Display the following items in sequence:
(1) kW
(2) kWh
(3) V
(4) I
(5) PF

IPP-S Installation guide Digipower Inc.
8
4.3
Pressed 3 seconds return to Normal Mode.
Load setting
In this mode, set CT combination in each loop.
Item
Key
Description
5.1
or
Select loop
5.2
Select CT number
5.3
Pressed 3 seconds return to Normal Mode.
5.4
Added/exit loop
5.5
Pressed 3 seconds to save then return to Normal Mode.
Meter ID setting
In this mode, set Meter ID from 1 to 99.
Item
Key
Description
6.1
or
Select Meter ID
6.2
Select 1st digit or 2nd digit
6.3
Pressed 3 seconds return to Normal Mode.
6.4
Pressed 3 seconds to save then return to Normal Mode.
Note:
1. Set Meter ID = 0, restore factory setting as following:
Meter ID = 01
Load 1 = CT-01
Brightness = 1
3P4W
2. Set Meter ID = 100, restore test setting as following:
Meter ID = 01
Table des matières

















