Crysalli CBR Series Manuel utilisateur

UCM Install Guide
Sparkling & Still Remote Dispenser System
CR-UCM1 & CR-UCM2 Remote Chiller with
CBR, LIT, or CM Series Towers.
32018
www.crysalli.com

CR-UCM Series Start-up and Install Check List
Start-up Sequence:
• Turn Water on to unit (conrm ow from faucets)
• Plug unit in and toggle On/O switch to the On posion.
• Turn CO2 on at tank. (carb tank may need to be bled)
Water Filters, CR-24FC and CR-24FCP
• Water On. Filters ushed via the ush valve and owing water.
• Water pressure at/through water lter system above 50 psi and not dropping o.
• All connecons leak free.
• 50 PSI water reducer valve installed aer water lter, poinng in the correct direcon.
CO2
• CO2 hose from unit: are nut connecon on end of CO2 Hose ght to CR-3741 CO2 Regulator
(Be sure to use nylon washer supplied with Reg in ng).
• CO2 Reg connected to CO2 tank (card board/plasc washer used) ght and leak free.
• CO2 Tank Full, Opened all the way and Set to 75 PSI.
CBR tower:
• Faucets ght to shank and posioned vercally. Free of leaks. Customer has faucet wrench.
• Handles ght, front facing and labels are appropriate for water type.
• Sparkling water; cold, carbonated and tastes clean and pure. (Run a few liters of water; is carb pump
cycling on and ow consistent without gassing out).
• Sll Water: cold and consistent ow. Tastes clean and pure.
• Flow adjustment on faucets set and knob ghtened down so ow rate cant change
• Connecons to tower made using supplied Super Seal JG ngs from kit and leak free.
• All exposed Hoses and Fings all wrapped in insulated foam tape.
Remote Chiller: Unit on.
• Unit On and Plugged into a dedicated 120V outlet.
• Cabinet properly venlated to handle BTU load of unit heat. Can fresh air draw in and hot air vent out.
Unit free of obstrucons around it and can vent. If using a Fan box, check that it is plugged in and running.
• Unit posioned so Air Filter is accessible. If using a CR-ABUCM air bae, it is in place and sealing to vents.
• Rear outlet connecons for trunkline (hoses and ngs) to tower wrapped in insulted tape and leak free.
• Water Inlet connecon to unit leak free and not pinched o anywhere
• Water Bath lled with water up to the white stand pipe.
• Ice Bank formed on refrigeraon coils in water bath. Unit cycling on and o properly to maintain ice bank.
Unit will take 2 hours to form full ice bank aer inial start-up.
• Carb pump cycling on for 7-14 seconds aer 1.5 liters of Sparking water is poured, and not screeching.
• Agitator pump agitang bath water and pumping re-circ water through the trunkline.
Notes:


CBR and LIT Towers
Correctly
set and
ghtened
Fing not
ghtened
down
Using JG ngs

Mounng the RDP-1SSQ or RDP-3SS Recessed Drain Pan
RDP-1SSQ RDP-3SSQ
Counter requires a Square
cut for drain pan secon
and Hole cut for tower:
2” 2”
RDP-1SSQ for use with:
• CBR-V1C/W Tower
• CBR-V2C/W Tower
• LIT-V2C Tower.
• CM-2-PB-SB Push Buon
Specs:
• 12” x 15 1/8” Overall
• 2” Tower Hole on pan
• 10 3/8” x 8 1/2” Drain Pan
• 1/2” Dia Copper Drain Stub
• CBR-V1: 1 3/8” Hole
• CBR-V2: 1 1/2” Hole
• CBR-V3: 1 7/8” Hole
• LIT-V2C: 2” Hole
• LIT-V3C: 2” Hole
RDP-3SSQ for use with:
• CBR-V3C/W Tower
• LIT-V3C Tower.
Specs:
• 15” x 18 1/8” Overall
• 2” Tower Hole on pan
• 13 3/8” x 10 1/2” Drain Pan
• 1/2” Dia Copper Drain Stub
2” Threaded stud for mounng.
10-24 Thread with Locking Nut
and 3”x1” SS Mounng Strip
1/2” Drain Stub, connect hose/
pipe and run to oor sink.

Mount and connecng the CBR or LIT towers
Insert tower into the hole in the countertop for it, thread on and ghtened the set nut to secure tower.
Locate grey SI030812S Super Seal Union Elbow Fings supplied with the tower (one per tube). Loosen the
Collet Nut on the ng to the last thread then push the ng onto the 1/4” stainless steel tube as shown
on John Guest instrucon page. Tighten the Collet Nut all the way down to lock ng onto SS tube (failure
to ghten the collet nut can result in a leak or the ng slipping o). You will use the White Plug-In Elbow
ngs to connect the Product line from the trunkline to the tower. It is easiest to aach these ngs to the
product tubes of the trunkline rst (using the red locking clips), then connect them to the Super Seal ngs
on the tower tubes (see “CR-4L38 Trunkline Tower End Connecons” page).
SI030812S Super Seal Elbow,
loosen collet nut, push into SS
tube and ghten collet nut.
Step #2
Step #1
Locate the Box containing the Tower for the system. A Dra tower such as the
CBR-V2C, CBR-V3C or LIT-V2C are packaged with the Faucet bodies and handles
shipped loose, a Faucet wrench, a set of SI030812S Super Seal ngs for the 1/4”
Stainless Steel tubes on the tower, PP221212W Plug In Elbow ngs and Instrucons.
Crysalli 1739 Sabre St. Hayward, CA 94545. 510-732-0100. www.crysalli.com

Trunkline: 3/4” Foam
insulaon, with a PVC
exterior wrap.
Four 3/8” plasc barrier
tubes, wrapped together
Two Product tubes: Blue
Striped & Natural Color
Two ReCirc tubes: Red
Striped
Find the two White PP221212W Plug In Elbow
Fings that come with the CBR Tower and connect
them to the Product Tubes.
Find the Grey PIUB12S U-Bend ng in the UCM
install kit and connect it to the two re-circ tubes.
Use the Red locking clips.
PP221212W
PIUB12S
Once assembled, connected the stem end
of the Plug In Elbow ngs to the Super
Seal ngs on the tower. Connect the Blue
striped tube to le faucet tube for sparkling
water. Natural to Sll Chilled water. If using
a 3 Valve tower, run a separate hose from
the lter to the 3rd tube for ambient water.
Aer tesng the system for leaks wrap all
exposed hoses and ngs with the
Insulated tap found in the UCM install kit.
Step #3
Step #1
Locate the CR-4L38 Trunkline. 5’ will be included with the UCM install kit, unless a longer length was
ordered. If a longer length is being used pull the line from the Chiller to the tower, being careful not rip the
pvc wrap and not to make any bends that kink the tubes. Leave enough length at both ends so connecons
can be made and the chiller can move for service. If installing 3 Valve tower, the 3rd water line, ambient
water, should be tee’d o the water lter outlet and fed over to the tower.
Step # 2, Tower End
Cut back the insulaon (or tubes) so
2.5”-3” of Tubing is exposed.
Cut the two Product tubes (Blue Striped
and Natural Color ones) back 1.5”, so the
Red Striped tubes extend past them at
least 1.5”.
Cut the Tubes square and remove burrs
and sharp edges. Make sure the Red
Striped tubes are cut to the same height.
Step #4
CR-4L38 Trunkline Tower End Connecons

Once the Faucet Bodies are aached
to the Tower, thread the Handles on
to the them. Thread down ll the
posion the handle with curve is
facing you, if loose, ghten the black
set nut up to the handle base to lock
the handle in posion. Apply the
round Sparkling and Sll Water
image sckers to the appropriate
handles at the top of them.
Angle the faucet body
vercally straight
Push Faucet onto
the Shank
Set the faucet posion,
push back to lock in
Pull shank nut to faucet
and hand ghten
Tighten shank nut
with Faucet Wrench
Locate the Faucet Bodies, Handles and Faucet
Wrench.
The faucet bodies aach to the shanks, that
are pre-aached to the tower and leak tested.
When aaching the faucet body to the shank,
be sure the faucet is properly aligned before
ghtening it down. Adjusng the faucet angle
when aached to the shank can result in
loosening the shank to tower connecon
which can cause a leak.
Using the Faucet Wrench on the Shank Nut:
• Counter-clockwise ghtens the shank nut
to the faucet body.
• Clockwise loosens it for removal.
Mounng Faucets & Handles to Tower

Mount the Filter manifold
on the wall with at least 3”
of clearance at the boom
of the lters.
Installing the Water lter system, Water Regulator and Angle Stop Adaptor.
Locate the 2 PSEI012026 1/2” to
3/4” NPT ngs and PP062012W
5/8 Stem to 3/8 tube adaptor
ngs from the UCM Install Kit.
These are your inlet and outlet
ngs for the Twin Water lter
system. Wrap some Teon tape
around the threads of the 3/4”
NPT ng, aach them to the two
ends of the lter manifold. Push
the smaller adaptor ngs in to
the larger ngs and twist lock
the larger ngs collet.
To UCM
Chiller unit
The UCM Install kit comes with
12’ of the Blue PE-12-EI Tubing.
Cut this to appropriate length for
inlet and outlet needs.
NOTE: Always reference local plumbing
codes for the use requirement of a Back
Flow Preventer, as well as type and
locaon within the system.
Locate the 183-150-NF 50
PSI Water Reducer and
two PI451214FS ngs
from the UCM install kit.
Aach the Fings to inlet
and outlet of the Reg.
Install Reg with Arrows
poinng to the UCM unit
Locate the PSEI6012U9
Angle stop adaptor in
the UCM Install Kit.
Locate the angles stop
water source feeding
the system, remove the
compression nut and
ferule ring from it and
replace with the
PSEI6012U9 ng.
PI451214FS
183-150-NF
PSEI012026
PP062012W

Placing the UCM Remote Chiller
The CR-UCM Chillers generate a lot of heat when running, take all
necessary measure to place it in an environment/space that allows for it to vent
hot air out & away and pull in fresh cool air. Failure to do so will void warranty and
cause operaonal issues.
Place the CR-UCM Chiller so the front air lter is facing out or has the clearest path
to breath air in, while being accessible for removal and cleaning. If using the
CR-ABUCM Air Bae assembly slide it over the air lter and posion the unit so
the bae presses up to vent holes/louvers of the cabinet.
The unit will vent hot air out the sides (and back on the UCM2), leave at least one
side free of obstrucons and posioned so this hot air can vent out of the space.
The top of the unit will need about 8”of clearance so the lid can be removed and
the water bath lled with water and inspected. If going in a cabinet, avoid placing
the unit directly under the CRR dra tower since you may not get enough
clearance with the tower stem and lines protruding down.
If wall mounng the unit, appropriately anchor the Wall Mount Bracket (CR-
WMB1 or WMB2) to the wall/studs so it can support a minimum of 300 lbs.
Remove the feet/legs from the chiller and place it on the Bracket, use the supplied
5/16-18 1” bolts to screw the unit to the bracket via the leg holes.
CR-WMB2
CR-ABUCM
CR-TFB1
Ce manuel convient aux modèles suivants
9