Clearfield FieldSmart Manuel utilisateur

FieldSmart®FxDS Frame
Installation Manual ______________________________________________________
Manual 012010 REV H - July 2018

Direct: 763.476.6866 • National: 800.422.2537 • www.SeeCleareld.com • [email protected]
2
FieldSmart®FxDS Frame
Installation Manual _________________________________________________________
Manual 012010 REV H - July 2018
Table of Contents
Application 3
Description 3
Technical Specications 3
Tools and Optional Materials 4
Packaging 5
Floor Installation 6
Raised Floor Installation 8
FxDS Frame Kit Installation 12
Interbays and End Guards 12
SmartRoute Troughs 13
End Guard Support Bars 14
Doors 15
Adjusting the Doors 16
Grounding 16
Panel Mounting 17
Cable Mounting and Routing 18
Patch and Splice Panels 19
Routing Ribbon Fiber 20
Cable Routing Examples 21
Tie Panels 22
FxDS PON Insert Kit 23
Connector Cleaning Procedure 25
Standard Warranty 28
Proprietary Notice 29
Technical Support 29

3
FieldSmart®FxDS Frame
__________________________________________________________ Installation Manual
Direct: 763.476.6866 • National: 800.422.2537 • www.SeeCleareld.com • [email protected]
Manual 012010 REV H - July 2018
Application
The FxDS Frame Kit is a fully contained ber management system for the inside
plant. The seven foot seismic frame is provided along with full length front and rear
doors that provide protection for termination elds, incoming distribution cables and
interbay routed jumpers. When used in conjunction with the FxDS panels, ultimate
density and protection is offered at “grow-as-you-go” cost.
Description
The FieldSmart Fiber Crossover Distribution System (FxDS) provides a system of
modular and scalable building blocks to congure a frame system that delivers
industry-leading scalability and ber protection without jeopardizing density or
increasing cost.
The FxDS system easily congures for panel placement and scales simply from 12
ports to a full rack of 1,728 ports as needed. The FieldSmart FxDS requires only
four unique building blocks (SKUs) to congure initial deployment. The user then
adds into the frame whatever is needed as subscriber take rates dictate. The FxDS Frame Kit is an industry standard
7’ x 19” seismic frame that is easily assembled with a set of vertical interbay slack management panels, upper and lower
crossover troughs and a set of removable doors.
SmartRoute Troughing builds upon the cable management functionality with a sleek method of providing a continuous
channel for bay-to-bay routing in a safe and efcient manner without increasing jumper lengths. SmartRoute Troughing
allows the service provider to carry the distance and weight of thousands of jumpers on a horizontal plane. This spreads
the pile up and eliminates the risk of micro and macro bends. When used across multiple frames, up to three continuous
channels are created allowing bay-to-any-bay routing in a safe and efcient manner. Front route troughs are available when
the frame is deployed with a PON Kit or for environments where interbay routes are not anticipated.
Technical Specications
FieldSmart FxDS Frame Kit
Dimensions 7’ H x 36” W x 18” D
Ratings Compliant to Telcordia GR-449
Port Density 1,728 SC or 3,456 LC
Cassette Types Supported Clearview®Blue
Connector Types SC/UPC, SC/APC, LC/UPC, LC/APC, MPO (additional options available upon request)
Cable Types Indoor Riser, Indoor Plenum, Indoor/Outdoor, Outdoor (Riser/Non-Rated), Outdoor Armored (Riser/Non-Rated), FieldShield®
Splice Capacity 12 or 24 splices in each Clearview Cassette
Storage Capacity One meter of 900 μm ber
Cable Entry Compatibility Top and bottom (oor) entry
Caple Entry Clamp Location On-frame cable clamps (Note: On-frame cable clamps included with FxDS Patch Panels)
Recommended Jumper Length Three meters, plus two meters for each additional frame
Material Steel with almond powder coating

Direct: 763.476.6866 • National: 800.422.2537 • www.SeeCleareld.com • [email protected]
4
FieldSmart®FxDS Frame
Installation Manual _________________________________________________________
Manual 012010 REV H - July 2018
Tools and Optional Materials
Tools:
• Sockets (1/2”, 3/4” and 15/16”)
• Ratchet with Extension
• Phillips Screwdriver
• 1/8” Allen Wrench
• Hammer/Rotary Drill
• 5/8” Masonry Drill Bit
• Blowout Air Bulb or Vacuum with Small Diameter Tube
Materials (ordered separately):
Standard Frame:
• Isolation Pad (19” Frame P/N FMA-L1Z-SUB)
Floor Mounting:
• Floor Mounting Kit (P/N 009106)
Raised Floor Mounting:
• Raised Floor Mounting Kit (P/N 011236)
Patch and Splice Panels:
• Radius Limiter Brackets for Buffer Tube Slack Storage
(P/N 010600)
Ribbon Fiber Protection:
• High Density Ribbon Breakout Kit (P/N 010475)
• Ribbon Fanout Kit (P/N FMA-MZZ)
Radius Limiter Bracket
Breakout Kit Fanout Kit
Isolation Pad

5
FieldSmart®FxDS Frame
__________________________________________________________ Installation Manual
Direct: 763.476.6866 • National: 800.422.2537 • www.SeeCleareld.com • [email protected]
Manual 012010 REV H - July 2018
Packaging
The FxDS Frame Kit will come in a wood packaging
crate (88” long x 28” wide x 29” high).
Open the crate by removing the 6 screws and removing
the lid. The screws are called out by black circles.
Carefully remove the contents. This includes:
One (1) frame and isolation pad, (4) doors, (2) interbays, (2) end guards, a trough kit usually containing (3) troughs,
a grounding bar and miscellaneous hardware for securing the hinges to the doors and end guards as well as for
mounting the frame to the oor.
Note: The FxDS Frame system comes in a variety of congurations so the above bill of materials will vary.
This is what the crate will look like while unpacking. Once you conrm all the parts and hardware are available, it is
time to install the frame.
Note: Floor mounting hardware is NOT included with the standard frame. Hardware is sold as a separate line item
(Cleareld P/N 009106).
1.
2.
3.
4.

Direct: 763.476.6866 • National: 800.422.2537 • www.SeeCleareld.com • [email protected]
6
FieldSmart®FxDS Frame
Installation Manual _________________________________________________________
Manual 012010 REV H - July 2018
Floor Installation
IMPORTANT: If your frame is to be mounted next to a wall, or there are multiple frames in a line-up, you MUST
install the interbay management and end guards (including the female hinge pieces for the end guard support bars)
BEFORE mounting the frame to the oor.
Tools:
• Hammer (or rotary) drill (with depth gauge recommended)
• 5/8” masonry drill bit
• Socket wrench set
• Blowout air bulb or vacuum with small diameter tube
Using a 5/8” masonry bit, drill the four required holes to a
minimum depth of 2” (approx. 50mm).
Note: If for some reason you have trouble drilling the 5/8” hole,
we recommend rst drilling a ¼” pilot hole before drilling out to
5/8”.
Thoroughly clean the dust from each hole, using a vacuum or
blowout air bulb.
Note: To not degrade the anchor’s installed performance, any unused anchor holes (or other nearby holes) in the
concrete within 3” must be lled with an epoxy ller (pour stone) or equivalent. Filled holes must be fully cured before
anchors are installed and torqued.
19” Frame
9 5/8”
22”
1. Determine where the frame is going to be installed. Using the isolation pad as a template, mark the 4 holes where
frame will be secured to the oor.
2.
3.

7
FieldSmart®FxDS Frame
__________________________________________________________ Installation Manual
Direct: 763.476.6866 • National: 800.422.2537 • www.SeeCleareld.com • [email protected]
Manual 012010 REV H - July 2018
Place the isolation pad in position over the predrilled holes and align as necessary. Lift the frame onto the isolation
pad and line up with holes.
Ensure that the anchor’s expansion shield is not expanded. Place the end of the anchor into the predrilled hole.
Repeat for the other drilled holes. Make sure the anchor is fully embedded in the concrete.
Align the edges of the 2” square washer parallel with the slots in the frame base to obtain the maximum material
overlap. Once aligned, tap each anchor/washer assembly until it is seated rmly in the hole against the 2” square
washer.
Pre-tighten each anchor with a socket wrench or box-end wrench; do not use an open-end wrench (which could easily
slip off and cause injury). Before nal tightening, ensure that the frame is properly aligned (in the row and with any
adjacent frames). Torque each anchor to 60 ft-lbs.
Note: When using the break-off type anchor, a torque wrench is not required. The anchor’s (red) torque cap shears off
at a predetermined torque value (approximately 60 ft-lbs.), leaving a green seal on the bolt head, indicating proper
tightening.
The anchoring line up should look like this:
Note: Square
washers will be
packaged in base
of frames
Threaded Rod
4.
5.
6.
7.
8.

Direct: 763.476.6866 • National: 800.422.2537 • www.SeeCleareld.com • [email protected]
8
FieldSmart®FxDS Frame
Installation Manual _________________________________________________________
Manual 012010 REV H - July 2018
Raised Floor Installation
IMPORTANT: If your frame is to be mounted next to a wall, or there are multiple frames in a line up, you MUST
install the interbay management and end guards (including the female hinge pieces for the end guard support bars)
BEFORE mounting the frame to the oor.
Tools:
• Hammer (or rotary) drill (depth gauge recommended)
• 5/8” masonry drill bit
• Socket wrench set
• Blowout air bulb or vacuum with small diameter tube
Also required is a raised oor mounting kit (Cleareld P/N 011236).
1. 1/2-13 Hex Nut (Qty 8)
2. 1/2 Lock Washer (Qty 4)
3. 1/2 Flat Washer (Qty 4)
4. 1/2-13 x 30 Threaded Rod (Qty 4)
5. Hilti HDI 1/2” Anchor (Qty 4)
6. 1/4 x 2” Flatwasher .515 Hole (Qty 8)
7. Split Tubing 30” (Qty 4)
Screw Sequence for Floor Screw Sequence for Frame
Note: Cleareld recommends installing the anchors directly into the concrete oor.

9
FieldSmart®FxDS Frame
__________________________________________________________ Installation Manual
Direct: 763.476.6866 • National: 800.422.2537 • www.SeeCleareld.com • [email protected]
Manual 012010 REV H - July 2018
Using the isolation pad as a template, mark on the panel(s) of the raised oor the 4 holes where the frame is going to
be secured to the oor. Using a 5/8” drill bit, drill a hole through each of the oblong marks you made with the isolation
pad.
Take the threaded rods from the raised oor mounting kit and slide one through each of the holes. Using a hammer
and holding them perpendicular to the oor, tap on the end rmly. The goal is to make a “mark” on the concrete oor
visible enough to see where the 4 holes should be drilled.
Once the concrete oor is marked, remove the threaded rods and oor panels. Using a 5/8” masonry bit, drill the four
required holes to a minimum depth of 2” (approx. 50mm).
Note: If for some reason you have trouble drilling the 5/8” hole, we
recommend rst drilling a 1/4” pilot hole before drilling out to 5/8”.
Thoroughly clean the dust from each hole, using a vacuum or blowout
air bulb.
Note: To not degrade the anchor’s installed performance, any unused
anchor holes (or other nearby holes) in the concrete within 3” must be
lled with an epoxy ller (pour stone) or equivalent. Filled holes must be fully cured before anchors are installed and
torqued.
19” Frame
9 5/8”
22”
1.
2.
3.
4.

Direct: 763.476.6866 • National: 800.422.2537 • www.SeeCleareld.com • [email protected]
10
FieldSmart®FxDS Frame
Installation Manual _________________________________________________________
Manual 012010 REV H - July 2018
Install anchors into the oor. Replace raised oor panels and
insert threaded rods through the four holes.
Note: You are not installing the rods at this point. We are
measuring the rods to be cut to the appropriate length.
Measure the rods 2.5” above the oor and mark with a
permanent marker. Remove the rods and cut each rod at the
mark. Remove the oor panels.
Before installing rods back into the oor, place a nut and then
a washer on the threaded rods. Take the rod and install it into
the anchor installed in the oor.
Tighten the nut down to secure the rod into the oor. Tighten
each bolt to 65 ft-lbs., +10, -0 ft-lbs. The anchor will expand
and secure itself to the oor.
Once all four rods are secure, thread another hex nut, then
washer on each rod. Make sure the nut and washer are
approximately ½” below the raised oor level. This hardware
will be tightened down AFTER the frame is set into place but
BEFORE securely bolting the frame to the oor.
5.
6.
7.
8.
9.