The below instructions indicate step by step how you ensure a trouble-free installation and a satisfactory operation. It is
therefore of VITAL IMPORTANCE that you take the necessary time and care in order to ensure that the installation
tolerances are not exceeded, otherwise the lift will not function effectively, and you will not benefit fully from your
purchase of the lift.
NB: IF THESE INSTALLATION INSTRUCTIONS ARE NOT FOLLOWED STRICTLY, THE LIFT IS NOT COVERED BY
WARRANTY.
INFORMATION FOR CONSTRUCTION ENGINEER OG ARCHITECT
To allow full use of the lift capacity, the strength of the concrete floor or foundation should fulfill the following
specifications:
a) Load capacity: min. 550 kp/m² - 5500 N/m²
b) Surface spot load: 3.5 kp/cm² - 350 kN/m²
c) Extraction load for expansion bolts: 1330 kp/bolt –13,3 kN
INFORMATION FOR FITTER
The accessory kit consists of a number of small plastic bags with a number printed on each of them. This number will be
pictured by a small numbered bag. Do not, therefore, mix the contents of the different bags.
EXPANSION BOLTS: order No. for set 776898 (not included in the delivery).
Levelling plates (see page 9-10) are to be ordered in the necessary quantity on part number 502199.
NB: Note this arrow . The lift will throughout these instructions be shown from the drive-on direction (see picture 1)
Please note the designations “front” and “back” compared to the drive-on direction, and the numbering of the posts –
these designations will be referred to in the installation manual.
The below picture shows where each switch is to be fitted on the lift. There will therefore be refered to this picture all
along the manual.