Atlantic TRION Manuel utilisateur

Ionizer Electronic Water Clarifier
Instruction Manual
Ioniseur manuel électronique d’instruction de
l’eau clarificateur
Clarificador de agua ionizador electrónico
Manual de instrucciones
1-877-80-PONDS
www.atlanticwatergardens.com
Model No. TRION

2
Introduction
Thank you for choosing the Triton Ionizer, an electronic water clarifier
for Water Gardens and Pond-free water features. This low voltage
water management system electronically introduces microscopic ions
of copper, silver and zinc into the water which control algae growth and
keep your pond crystal clear. This mineralized water is not only safe for
animals and plants, but actually promotes healthy living conditions in the
water. Mineralized water maintains a residual ability to treat algae and is
not affected by heat or sunlight, greatly reducing the need for chemical
treatments.
Features:
• Safe for fish, plants, and domestic pets
• Low maintenance
• Clears water without the use of harsh chemicals
• Easily installed in any new or existing water feature
• Level of mineralization is controlled by the LED panel
• Cast Mineral Electrodes are self cleaning
• Treats ponds up to 25,000 gallons
• 1 year warranty
Caution:
• DO NOT operate this product under any condition other than those
for which it is specified. Failure to observe the precaution can lead to
electrical shock, product failure, or other problems.
• Follow all aspects of local electrical codes when installing the
Triton Ionizer.
• To reduce the risk of electrical shock, connect only to a 110 volt
receptacle protected by a ground fault circuit interrupter (GFCI).
Prior to Installation:
Heavy organic loads or large amounts of debris build-up will greatly
reduce the Triton Ionizer’s effectiveness. If installing the ionizer in an
existing pond, a thorough clean-out is recommended prior to operation.
If excessive amounts of debris are present, it will take much longer to
raise the mineral levels of the water and achieve the desired results.

3
Water Parameters for Optimal Performance:
To achieve the best results with the Triton Ionizer it is recommended
that the water feature’s water is within the parameters listed below.
The water feature's water parameters can change during the season,
especially in features that experience excessive evaporation and require
significant water to be added. Many times a simple water change can
help reset the water feature’s water parameters.
Total Alkalinity 80-120ppm
PH 7.2-7.8
*Note: maximum operating range: Total Alkalinity 80-250ppm
*Note: pH can be affected by heavy loads of debris composition
*Warning: Copper ions can be toxic to fish if the alkalinity is below
50ppm
Mount the control panel in the desired
location. The control panel is weather
proof, but should be mounted on a
wall or post above ground level. Ensure
that the power cord is within reach of a
properly grounded GFCI outlet, and that
the electrode cord will reach the desired
installation point. If installing the Triton
Ionizer in conjunction with Atlantic Pro
Series skimmers, the electrode housing
should be plumbed into the waterfall
inside the pump chamber in the back of the skimmer. (Fig.1) If installing
the Triton Ionizer in conjunction with Atlantic Oasis Series skimmer, the
electrode housing will need to be installed in a valve box just outside
of the skimmer. The valve box must be located in an area accessible for
maintenance and winterization.
Installation:
Fig. 1
Fig. 2
Measure the feed line to determine the
proper placement of the electrode hous-
ing. (Fig.2) The electrode housing should
be installed in the center of the waterfall
supply line, between the check valve and
the outside wall of the skimmer.
Note: The electrode housing utilizes
2”sch40 slip connections and can be in-
stalled in a 2” flexible PVC supply line us-
ing standard glue and cleaner. Additional
fittings (not included) may be required to
adapt the electrode housing to a specific
sized pipe.

4
Fig. 3
Fig. 4
Fig. 5
Fig. 6
Fig. 7
Using a hacksaw, PVC saw or PVC cutters;
remove a 2 ½” section of the waterfall
supply line. (Fig.3) Dry fit the electrode
housing and waterfall supply line to verify
that they line up properly.
Install the electrode housing in a horizontal
position with the threaded port facing the
front of the skimmer. Fig.4) Connections
can be made using standard PVC glue
and cleaner.
A red dot has been placed on the top
of the electrode fitting to ensure proper
alignment. When fully tightened, the red
dot must be aligned with the waterfall
supply line on either the inlet or outlet
side of the electrode housing. This will
orient the probes side-by-side and allow
water to flow between the electrodes
rather than around them. Wrap the
threads with Teflon tape or apply a thin
layer of plumbing paste prior to installing
electrode. This will ensure a water tight
connection and make it easier to remove
the electrode for inspection or replace-
ment. Install the copper electrode (Fig.5),
tighten the fitting by hand and then finish
with 1-2 additional turns using a wrench,
making sure that the red dot aligns with
the center of the waterfall supply line.
Connect the control panel to the
electrode. Fig.6)
The Triton Ionizer can also be installed
inside of Atlantic pump vaults when used
in pond-free water features. (Fig.7)

5
Operation:
The Triton Ionizer must have water flowing through the electrode hous-
ing at all times when the unit is turned on. During operation, ions try to
jump from one electrode rod to the other and are swept away by the
flowing water. The Control panel reverses polarity regularly to ensure
even consumption of the electrodes. Lack of water flow enables the
ions to jump and attach to the adjacent electrode. This results in insuf-
ficient treatment of the water and excessive corrosion of the electrodes.
Unplug the Triton ionizer any time that the pump is turned off.
Ionization Level
Operation
indicator Power indicator
Electrode
connector
Electrode
Electrode
housing
The Triton Ionizer will return to the previous level of ionization when
power is restored.
• Turn on the pump
• Plug in the Triton Ionizer and set at “full” power, illuminating all of
the bars within the LED panel. Using the + and - buttons on the
left side of the LED bars will adjust the level of ionization.
• Monitor copper levels using the supplied test strips over a period of
days. Once copper levels are elevated between 0.2 and 0.25ppm,
lower the level of ionization to 1 or 2 bars on the LED panel.
• Test water weekly to ensure that copper readings are at the correct
level. If needed, the level of ionization can be adjusted using the +
and – buttons on the control panel.
• Once desired water clarity is achieved, operating the Triton Ionizer
at minimum levels and adjusting based on the conditions of the
water feature will help prolong the life of the anodes.
Note: Water volume, total alkalinity and the amount of debris in a pond
are all factors that may affect how quickly copper levels are elevated.
Please note that it may take several weeks of operation for copper
levels to become detectable. It is not unusual for the test strips to

6
show low copper levels after long periods of operating at “full” power.
This is due to copper ions being consumed within the water feature as
they break down organics. If test strips indicate copper levels above
0.25ppm, reduce ionization to one bar until tests results are within the
safe range. A partial water change will also aid in reducing copper
levels.
Maintenance and Inspection:
During normal operation the LED operation light located above the
ionization bars on the control panel will display as solid green. This
indicates that the unit is operating correctly and no maintenance is
required. If the LED operation light displays as flashing green or red,
please refer to the trouble shooting section of the manual and take
corrective measures immediately.
• If the water feature will be run during freezing temperatures, it is
recommended to remove the copper electrodes from the electrode
housing and replace it with a standard threaded 2” sch40 PVC plug.
Removing the electrodes during winter months will help prevent any
unnecessary corrosion from forming during this period.
• If the water feature will be shut down during the winter months it
is necessary to make sure all water is drained from plumbing line
and electrode housing. If the Triton Ionizer has been installed inside
of an Atlantic Skimmer or Pump Vault according to the Installation
section of this manual, simply loosen the outlet union on the Triton
check valve and allow the water to drain from the plumbing line.
Draining the water will eliminate the potential for damage to the
electrode and electrode housing caused by ice build-up.
Winterization:
Colder weather will naturally reduce algae growth, which subsequently
reduces the demand for copper ions. It is recommended to shut down
the Triton Ionizer during winter months in colder climates, which will
extend the life of the electrodes during warmer periods when most
needed.
• Unplug the control panel from the electrical outlet. The control panel
is weather proof, but can be removed and stored inside to further
protect it during the winter months.

7
Trouble Shooting Guide
• Increase level of ionization
• Verify that the electrodes are installed properly and the
red dot is aligned with the inlet or outlet side of
the electrode housing / Increase flow rate through the
housing.
• Inspect electrode and remove any debris
• Inspect and replace the depleted electrode
• Level of ionization set too low
• Insufficient water flow
through the electrodes
• Debris lodged between electrodes
• Electrode is depleted
• Increase level of ionization
• Verify that the electrodes are installed properly and
the red dot is aligned with the inlet or outlet side
of the electrode housing / Increase flow rate through
the housing.
• Inspect and replace the depleted electrode
• Level of ionization set too low
• Insufficient water flow
through the electrodes
• Electrode is depleted
• Reduce ionization to one bar until tests results are
within the safe range. A partial water change will
also aid in reducing copper levels.
• Level of ionization set
to high
• Inspect and replace the depleted electrode• Electrode is depleted
• Verify that the electrodes are installed properly and the
red dot is aligned with the inlet or outlet side
of the electrode housing / Increase flow rate through
the housing.
• Insufficient water flow
through electrodes
• Inspect electrode and remove any debris
• Verify that the electrodes are installed properly and the
red dot is aligned with the inlet or outlet side
of the electrode housing / Increase flow rate through
the housing.
• Debris is lodged between
electrodes
• Insufficient water flow
through electrodes
• Inspect 110 volt GFCI outlet / 12 volt AC transformer
power output
• Contact Dealer for repair / replacement
• Inspect electrode and remove any built-up corrosion
• No AC power
• Controller failure
• Short between electrodes
Power light not
illuminated
Operation light is
flashing GREEN
Continuous build-up
of corrosion on
electrodes
Operation light is
RED
High copper level
Low copper level
Cloudy / Dirty water
PROBLEM CAUSE SOLUTION

8
Introduction
Merci d’avoir choisi l’Ioniseur Triton, un clarificateur électronique pour
l’eau destiné au maintien de jardins d’eau et d’autres sources d’eau sans
étang. Ce système de gestion de l’eau à basse tension ajoute par voie
électronique des ions cuivre, argent et zinc microscopiques à l’eau afin
de limiter la formation d’algues et conserver ainsi la pureté de votre
étang de jardin. En plus de ne présenter aucun danger pour les animaux
et les plantes, cette eau minéralisée encourage un mode de vie sain dans
les milieux aquatiques. L’eau minéralisée sert à maintenir une capacité
résiduelle afin de traiter les algues, et comme la chaleur ou le soleil n’ont
aucun effet sur celle-ci, les besoins en matière de traitements chimiques
sont sensiblement réduits.
Caractéristiques :
• Sans danger pour les poissons, les plantes et les animaux
domestiques
• Entretien minimal
• Clarifie l’eau sans l’utilisation de produits chimiques abrasifs
• S’installe facilement dans toute source d’eau nouvelle ou existante
• Le taux de minéralisation est géré au moyen d’un panneau à DEL
• Les électrodes minérales coulées sont autonettoyantes
• Assure le traitement d’étangs contenant jusqu’à 25 000 gallons
• Garantie d’un (1) an
Mises en garde :
• NE FAITES PAS fonctionner cet appareil dans d’autres conditions
que celles pour lesquelles il a été conçu. L’inobservation de
ces mises en garde peut entraîner un choc électrique, la
défaillance de l’appareil ou d’autres problèmes.
• Respectez toutes les normes des codes électriques locaux au cours
de l’installation de l’Ioniseur Triton.
• Pour réduire le risque de choc électrique, ne branchez l’appareil que
dans une prise de courant de 110 volts protégée par un disjoncteur
de fuite à la terre (DDFT).
Avant l’installation :
De lourdes charges organiques ou une accumulation importante de
débris réduiront sensiblement l’efficacité de l’Ioniseur Triton. Si vous in-
stallez l’ioniseur dans un étang existant, un nettoyage en profondeur de
ce dernier est conseillé avant de faire fonctionner l’appareil. Lorsqu’une
quantité importante de débris est présente, les niveaux minéraux de
l’eau prendront beaucoup plus de temps à s’élever et par conséquent,
les résultats prévus se feront attendre.

Mesurez le circuit d’alimentation afin d’établir
l’emplacement adéquat du boîtier de l’élec-
trode. (Fig. 2). Le boîtier de l’électrode doit
être installé dans le centre de la conduite
d’alimentation de la chute d’eau entre le
clapet et le mur extérieur de l’écrémeur.
Nota : le boîtier de l’électrode est pourvu de rac-
cords à glissement de 2 po de nomenclature 40 et
peut être installé dans une conduite d’alimentation
flexible PVC de 2 po à l’aide d’une colle et d’un
nettoyant courants. Des raccords supplémentaires
(non compris) peuvent être nécessaires en vue
d’ajuster le boîtier de l’électrode à un tuyau de taille particulière.
9
Paramètres de l’eau requis pour un rendement optimal :
En vue d’obtenir les meilleurs résultats qui soient au moyen de l’Ioniseur
Triton, il est recommandé que l’eau de la source d’eau se trouve dans les
limites des paramètres de l’eau énumérés ci-dessous. Ces paramètres
peuvent changer au cours de la saison, notamment dans les sources d’eau
dont l’évaporation est importante et qui, par conséquent, nécessitent
l’ajout d’une grande quantité d’eau. Dans la plupart des cas, un simple
renouvellement d’eau peut contribuer à rétablir les paramètres de l’eau de
la source en question.
Alcalinité totale 80-120 mg/L
pH 7,2-7,8
*Nota : plage de fonctionnement maximale : alcalinité totale 80-250 mg/L
*Nota : les charges importantes de débris peuvent produire un effet sur le pH
*Avertissement : les ions cuivre peuvent avoir un effet toxique sur les poissons,
si l’alcalinité se trouve à moins de 50 mg/L
Installation:
Fig. 1
Fig. 2
Assemblez le panneau de commande où
désiré. Bien qu’il soit à l’épreuve des
intempéries, ce panneau devrait être fixé
sur un mur ou un poteau se trouvant au-
dessus du sol. Veillez à ce que le cordon
d’alimentation soit à proximité d’une prise
DDFT adéquatement mise à la terre et
que celui de l’électrode puisse atteindre le
point d’installation que vous avez choisi.
Si vous installez l’Ioniseur Triton avec un
écrémeur de la Série Atlantic Pro, le boîtier
de l’électrode doit être relié à la conduite
d’alimentation de la chute d’eau se trouvant à l’intérieur de la boîte
de la pompe à l’arrière de l’écrémeur. (Fig. 1). Si vous installez
l’Ioniseur Triton avec un écrémeur de la Série Atlantic Oasis, le boî-
tier de l’électrode doit être placé dans la boîte à clapet à l’extérieur
de l’écrémeur. La boîte à clapet doit se trouver dans un endroit ac-
cessible pour en permettre l’entretien et l’hivérisation.

10
Fig. 3
Fig. 4
Fig. 5
Fig. 6
Fig. 7
En vous servant d’une scie à métaux,
d’une scie PVC ou d’un coupe-tuyaux
PVC, retirez 2 po ½ de la conduite
d’alimentation de la chute d’eau. (Fig.
3). Ajustez à sec le boîtier de l’électrode
et la conduite d’alimentation de la chute
d’eau pour vous assurer qu’ils s’alignent
de façon adéquate.
Installez le boîtier de l’électrode horizon-
talement en veillant à ce que l’orifice fileté
soit en face de l’avant de l’écrémeur. (Fig.
4). Les raccords peuvent être effectués au
moyen d’une colle et d’un nettoyant PVC
courants.
Une pastille rouge a été apposée sur le des-
sus du raccord de l’électrode pour assurer
un alignement adéquat. Lorsqu’elles sont
bien serrées, la pastille rouge et la conduite
d’alimentation de la chute d’eau doivent
s’aligner dans le côté de l’entrée ou dans
celui de la sortie du boîtier de l’électrode.
Grâce à cet alignement, les capteurs se pla-
ceront côte à côte pour que l’eau puisse cir-
culer entre les électrodes plutôt qu’autour
de celles-ci. Enveloppez le filetage avec du
ruban pour joints filetés (téflon) ou appli-
quez une couche mince de pâte à plombe-
rie avant d’installer l’électrode pour assurer
que le raccord est complètement étanche
et que l’électrode peut être retirée facile-
ment en vue d’être vérifiée ou remplacée.
Installez l’électrode en cuivre (Fig. 5), serrez
le raccord à la main et fixez-le avec une
clef en le tournant une ou deux fois de plus
en veillant à ce que la pastille rouge et le
centre de la conduite d’alimentation de la
chute d’eau soient bien alignés.
Raccordez le panneau de commande à
l’électrode. (Fig. 6)
L’Ioniseur Triton peut être installé égale-
ment à l’intérieur de voûtes de pompe de
marque Atlantic, lorsqu’il est utilisé dans
une source d’eau sans étang. (Fig. 7)
Table des matières
Langues :
Manuels Système de filtration d'eau populaires d'autres marques

Wisy
Wisy LineAir 100 Manuel utilisateur

Schaffner
Schaffner Ecosine FN3446 Series Manuel d'utilisation

Pentair
Pentair FLECK 4600 SXT Guide de l'utilisateur

H2O International
H2O International H20-500 Manuel utilisateur

Renkforce
Renkforce 2306241 Manuel utilisateur

Neo-Pure
Neo-Pure TL3-A502 Manuel utilisateur