Artize QUADRO Guide de sécurité

Manual for Installation
Steam Shower Cabin
QUADRO - 120 X 100

* Images shown are for illustration purpose only.
Actual product may vary due to product enhancements.

• Safety Instruction & Precaution 01 & 02
• Tools 03
• Overall Dimensions 04
• Site Preparation & Installation Requirement 05
• Part Identification Reference 06
• The Cabin Base / Shower Tray Setting on Finished Floor Step 1 07
• Shower Wall Fixing on Base Tray Step 2 08
• Fixing the Drain Connection 09
•
Side Wall Fixing Step 3 10
•
Side Wall Fixing Step 4 11
•
Roof Panel Fixing Step 5 12
• Installing Glass Walls & Fixing Cabin Door Step 6 13
•
Electric & Plumbing Connections 14
•
Main Power Connections 15
• Faucet Mixer Features & Maintenance 16
• Steam Keypad 17
• Keyboard 18
• Settings 18
•
Steam Bath 19 & 20
• Choromotherapy 20
• Music Function 21
• Bluetooth 21
• Functions 22
• Alarm 22
• Aroma 22
• Boiler Maintenance 23
• Warranty 24
• Standard Packing Information 25
• Notes 26 & 27
Content

01
Caution
Product must be installed by the qualified person. The manufacturer declines all liability for events arising
from incorrect installation or operation of the tub. The product is designed for indoor use in bathrooms, and
must not be installed in the open. Always power off the product (Omnipolar switch in the OFF position)
when maintenance is to be performed on electrical components.
Electric safety
Product must be fixed securely and connected sturdily to the mains and the earthing and unipotential systems.
The manufacturer accepts no liability if the hydraulic and electrical circuits are not in compliance with
EN safety standards. The building’s electrical circuit must be in compliance with EN safety standards and
protected by a standards-approved differential switch (safety cut-out) with a differential value of 30mA.
The connection to the electrical mains must be permanent and made with a cable that is not lighter than type
of 3x2.5mm2. It must be intercepted by an Omnipolar switch with an opening of contacts of at least 230V
and a current of 16A. It should if possible be located outside the room and distant from locations where it
might come into contact with water.
Connecting the equipotential circuit
Provide equipotential connection of the metallic masses extraneous to the shower booth by using the earth
equipotential contact. Arrange the cable outlet near the electrical power supply.
Safety rules for bathroom
Sockets, lights, switches, and other electric devices must be installed outside the danger zones as laidout
by the laws and international standards for bathrooms. It is strictly prohibited to touch, handle, or switch on
electric appliances while using the shower booth.
Electrical appliances positioned in the zones surrounding the shower box must be securely fixed in position
to prevent them from falling into the shower box.
Safety Instruction & Precaution

02
225 cm
60 cm
60 cm
240 cm
240 cm
3
2
1
02
3
Precautions
The material used for the construction of the shower booth is extremely tough and durable, which is
demonstrated by the widespread use of this material in many industries.
However, this material may be damaged by certain chemical substances such as acetones and
solvents in general and stained by alcohol-based liquids if these are not removed immediately.
For this reason, it is advisable to protect the product surface with paper or cardboard (the packing
cartons may also be used) during installation, in order to ensure that no abrasive substances or paint
come into the surface. It is also advisable to avoid placing tools on the surface of the shower plate.
Immediately on delivery, check that the appliance is in perfect condition and that the packaging is
not damaged in any way.
Safety distances
Shower areas, saunas, bathrooms, swimming pools, and the surrounding areas are classified by EN safety
standards as special zones since the humidity and dampness associated with these areas can make them
extremely dangerous.
The standards specify four clearly defined areas: zone 0,1,2 and 3. The Omnipolar switch with an opening
of contacts of at least 3.5mm must be located outside of these zones, distant from possible contact with water.
The limits of the various danger zones may be modified by the presence of walls, protective panels, and
fixed insulating walls which limit access to the tub or to the shower plate. In this case, the area is delimited
by taking a piece of string whose length is that of the area and winding it around the wall to the opposite
side. The path taken by the end of the string marks the danger zone. The zone that is external to the four
danger areas is considered to be normal.
Important
Consult the technical data sheet of the shower cabin to be installed. We suggest the installation of a 100-micron
feed water filter and a water softener. Before positioning the shower box, it is the duty of whoever assembles
the product to check that all the connections are watertight.
Safety Instruction & Precaution

* Recommendation : Two person & standard tool kit required for product installation.
Tools
Ø6
Ø3
03

120
100
222
Overall Dimensions
Technical specification for 120 x 100
Gross weight 240 KG
Electrical & plumbing requirements
Required socket dimensions for drainage flex pipe (inner dia) ø50mm
Required length for flex pipe for drainage 400-800mm
Socket dimensions for water inlet (hot / cold) 1 / 2”
Inlet water pressure 2.5Bar-3.5Bar (300kpa)
Input voltage 220-240V
Frequency 50HZ
Power load 4.6KW
Product features
Steamer 4.5KW
Multi function head shower Rain + Mist
Cascade waterfall 1 pcs
Number of body jets (fixed) 6 pcs
Handshower 1 pcs
Chromotherapy RGB-LED
Bluetooth
Music / Speaker 2 pcs
Digital touch control 1
04

Site Preparation & Installation Requirement
* All dimensions in mm.
C.P : Electrical connection points (1.5mtr open wire).
C1 / F1 : Hot / cold water connection.
O1 : Drain point connection.
200
2000
950
90
100
100
100
500
Front wall
150
50
Entry / Door
05

1. Part Identification Reference
Over head
shower
Display /
Keypad
Body jets
Glass door
Diverter mixer
Shower tray
Drain waste
Steam dispenser
Wall outlet with
hand shower
Roof
Sitting bench
D’Scale
06

07
82mm
2. The Cabin Base / Shower Tray Setting
on Finished Floor Step 1
Table des matières
Manuels Cabine de douche populaires d'autres marques

US HORIZON
US HORIZON SORRENTO Series Manuel utilisateur

Arblu
Arblu PERSEO ANGOLO Q-R 2SL+1LF Guide d'installation

Novellini
Novellini R90 base p.80 Manuel de service

SANPLAST
SANPLAST KP1DJa/TX5b Manuel utilisateur

Insignia
Insignia 9015 Manuel utilisateur

Kohler
Kohler Sterling 2375 Series Manuel utilisateur