Allume SolShare Manuel utilisateur

1
SolShare
Installation Manual

2

3
AE-PN-083-v3.0
© Copyright – Allume Energy - All rights reserved.
This manual accompanies our equipment for use by the end users.
The technical instructions and illustrations contained in this manual are to be treated as condential and no part may be reproduced without the prior
written permission of Allume Energy and end users may not divulge the information contained herein or use this manual for purposes other than those
strictly connected with correct use of the equipment.
All information and specications are subject to change without notice.
USA - AE-PN-083-v3.0
This manual is intended for installations in the United States
of America. It is subject to change. Please check our website at
www.allumeenergy.com for the most up-to-date manual version.

4
Summary
Commissioning Document
Handling and Safety Instructions
I/ What’s in the box
II/ Mounting the SolShare
A. Installation site selection
B. Installation
III/ Electrical connection
A. Input / Output connections
B. Output connection to main switchboard
C. Running current transformer tails
D. Current transformers to SolShare connections
E. Current transformer clipping
F. Launch the SolShare
G. Commissioning the SolShare
Appendix
Technical Specications
p06
p07
p08
p10
p10
p11
p12
p12
p17
p18
p18
p19
p20
p20
p21
p25

5
Hello
Thank you for purchasing a SolShare system.
You are supporting the growth of solar energy. Due to the
cutting edge nature of this product, this installation will
likely be dierent from any other piece of solar technology
you have installed in the past. As a result, please follow
the guidelines in this manual carefully.
Made in Australia, your system is designed to meet all
United States conditions, regulations and codes. This guide
provides the general instruction of the installation procedure
of the SolShare.
If you have questions or feedback on the product or this
manual, feel free to reach out to Allume on +1 (213) 347-4293
and ask for a technical representative. Otherwise, you can
email support@allumeenergy.com.au with any queries.

6
Commissioning Notes
To be completed during installation and data entered into Commissioning App
Installer name: Company:
SolShare Connection
Unit Connected
(eg: Apt 1, Unit B, Common light & power, No connection)
Unit number
1 (L1)
2 (L2)
3 (L1)
4 (L2)
5 (L1)
6 (L2)
7 (L1)
8 (L2)
9 (L1)
10 (L2)
Unit Connection Identier
Installation Address:
State: Postal/Zipcode: Country:
Serial Number: 2P_100_

7
IMPORTANT SAFETY INSTRUCTIONS
WARNING: The SolShare cover must be opened only after the input and all output circuits are individually disconnected.
WARNING: Ensure the SolShare is grounded prior to operation. This product must be connected to a grounded, metal,
permanent wiring system or an equipment-grounding conductor must be run with the circuit conductors and connected to the
equipment grounding terminal or lead on the product.
WARNING: Opening of the SolShare must only be performed by certied electrician
WARNING: The Distributed Energy Resource System Grounding shall be installed per the requirements of the National Electrical
Code, ANSI/NFPA 70 and is the responsibility of the installer
CAUTION: The unit must be operated according to the technical specication datasheet provided with the unit
CAUTION: HEAVY OBJECT – This product has a weight of approximately 38kg. It’s un-boxing and mounting requires 2 people.
NOTE: The SolShare is Type 4 rated per the UL50E standard. Where used, cable glands must be UL Listed or Recognized and
rated to minimum UL Category 4, otherwise the supplied blanking seal to remain in place.
NOTE: Use only copper conductors rated for a minimum of 90 degrees Celsius, 194 Fahrenheit.
NOTE: The symbol appears at grounding points within the SolShare equipment. This symbol is also used in the manual.
Handling and Safety Instructions
SAFETY SYMBOLS INFORMATION
The following safety symbols are used in this document. Familiarise yourself with the symbols and their meaning before
installing or operating the system:
Important:
xxxxx xxxx xxxx xxx xxxx xx xxxx xxx xxxx
Important:
xxxxx xxxx xxxx xxx xxxx xx xxxx xxx xxxx
Warning:
xxxxx xxxx xxxx xxx xxxx xx xxxx xxx xxxx
This symbol denotes a critical safety instruction that must
be followed to ensure safety of installer and safe operation
of the SolShare once commissioned. This box is sometimes
denoted in green to provide further emphasis.
This symbol indicates an instruction which: will ensure
proper operation of the SolShare once commissioned or
will help with the installation efficiency. This same box is
sometimes denoted in green to provide further emphasis.
This guide is provided to help the installer understand
the standard SolShare installation procedure.
Installations may vary depending on the existing electrical
infrastructure and local electrical safety standard. It is the
responsibility of the electrician to ensure their installation
meets the local electrical safety standard.
During installation, testing and inspection, adherence to all
the handling and safety instructions is mandatory. Failure
to do so may result in injury or loss of life and damage
to the equipment.
Warning:
xxxxx xxxx xxxx xxx xxxx xx xxxx xxx xxxx
SAVE THESE INSTRUCTIONS. This manual contains important instructions for the SolShare 2P-100 that shall be
followed during installation and maintenance of the power division control system.

8
Check for Transport Damage
Make sure the SolShare is intact following transportation. If there are any signs of visible damage, please contact your dealer
immediately. Carefully check that all of the components have been supplied. If anything is missing, contact your dealer.
I/ What’s in the box
Mounting bracket Split current transformer
with 10m tails
CT connector block
SolShare unit Switchboard labels
x10 pairs
x 1
x 2 x4
x 1
SOLSHARE
CT Connector Install Aid
Fastener Locking
plate
x 1x 4

9
Installation overview
The SolShare-2P distributes solar energy by rotating the
supply to each unit on each line.
One output on each line (2 units) will receive the solar
generation at any point in time. The SolShare will rotate the
supply periodically, approximately every 60 seconds, whilst
ensuring each unit receives the same amount of solar energy
each month.
For example, if a 16.4kW AC solar system is installed, with
10 units connected, then each unit will receive solar energy
allocation equivalent to a dedicated 1.6kW solar system. Units
can be connected to solar on both L1 and L2 if their demand
merits a larger solar allocation than 1.6kW.
If a unit has received more solar energy than their total energy
consumption for the month then the SolShare will suspend solar
energy supply to that unit, preferencing other connected units
until their total demand again exceeds their solar delivery. This
is intended to remove any nancial wastage of the solar energy.
If a non-even allocation of solar to each unit is required,
then the SolShare’s sharing algorithm can be congured to
incorporate this. Please contact Allume energy at support@
allumeenergy.com.au to arrange this.
The SolShare takes a single split-phase input from a grid-
connected solar inverter(s) and connects to each participating
unit on a single line (L1 or L2) to the load side of their Unit
Main Breaker at their meter panel.
A single-pole Unit PV Breaker (Inverter Supply) is required
on each output between the SolShare and each unit’s Main
Breaker. This allows for the isolation of the SolShare and the
solar supply of any of the connected units.
A typical installation conguration is displayed below.
Electricity Meter Panel - US version 2
SOLSHARE
XXXXXX
M1
XXXXXX
M2
XXXXXX
M3
XXXXXX
M4
XXXXXX
M5
XXXXXX
M6
XXXXXX
M7
XXXXXX
M10
XXXXXX
M8
XXXXXX
M9
Unit’s Main Breaker
Electricity Meter Panel
Unit PV Breakers
(Inverter Supply)
minimum
6”
Explained
on p15
Explained
on p16
split phase
from inverter
Solar Junction Box
Cable trough

10
II/ Mounting the SolShare
A. Installation site selection
Do not mount the SolShare
on ammable wall material
90˚
Mounted Vertically
Do not mount the SolShare near
ammable material or gases
90˚
Mounted Vertically
Environmental boundaries
90˚
Mounted Vertically
Max ambient
temperature:
+122°F (50°C)
Min ambient
temperature:
-13°F (-10°C)
Relative humidity:
0-90%
90˚
Mounted Vertically
Mount vertically Install in an easy to observe
and operate location
90˚
Mounted Vertically
≈45″
To minimize cabling required, the SolShare should be
mounted as close to the main switchboard (tenancy
isolator board) as possible.
To allow for easy installation and maintenance ensure that
there is adequate space surrounding the SolShare and that
it is mounted at a convenient height. Please ensure the
following mounting requirements are also met when selecting
the location of the SolShare.
90˚
Mounted Vertically
Do not mount in direct sunlight
Requirement for
installation space
6″6″
20″
20″
Note: Where possible, do not install the
SolShare below a cable tray - this may affect
the SolShare’s ability to connect reliably with
the Wi-Fi at site.
Internet communications
A Wi-Fi network must be
available at the site to
enable commissioning
and ongoing monitoring.
≈20″
SolShare
dimensions:
36.2″x 19.1″x 10.6″
(H x W x D)
Autres manuels pour SolShare
3
Table des matières
Autres manuels Allume Onduleur