AIRxTOUCH KIOSK 2 Series Manuel utilisateur

1
Installation guide
The Touchless Revolution
v2.0

2
COPYRIGHT
This manual is protected by international laws on copyright. It is strictly forbidden to reproduce,
distribute, translate or transmit in any form or by any means, electronic or mechanical, including
photocopying, recording or storing in a storage and retrieval system, any part of this document
without prior consent of iNUI Studio SA.
Copyright © 2021 · iNUI Studio SA.
BRANDS
AIR TOUCH® and AIRxTOUCH® brands and logos are the exclusive property of iNUI Studio SA.
All other trademarks and copyrights are the property of their respective owners.

WARNINGS TO PREVENT PRODUCT FAILURE, PERSONAL INJURY,
ELECTRICAL SHOCK, FIRE AND EXPLOSION INSTALLATION AND
SAFETY.
› Do not install the appliance or power cord near a source of heat or cold.
› Do not install the unit in an unventilated space. An increase in temperature could cause a re.
› Make sure of the solidity of your surface.
› Do not install the machine on an unstable or vibrating surface (loft loose, slope surface, etc.).
The product may fall and be damaged and/ or occur damage.
› Do no install the unit in a location exposed to dust, moisture, oil or smoke.
› Do not drop the appliance while moving. Failure of the product or injury may occur.
› Do not place the appliance on its forehead. The screen can be damaged. Place the appliance gently.
Failure of the product or injury may occur.
› The installation of the device in an unsual place (a place exposed to a lot of ne particles, chemicals or extreme
temperatures where the device must operate continuously for a long period of time) can seriously affect its performance.
Be sure to consult the iNUI Studio customer service center if you want to install the device in such a place.
› Do not use the device near a ashing environment (light) to avoid interference.
› An alteration of the performances can be noticed in somes very specic cases with white and highly reective oor.
(e.g. white glossy marble oor) and harsh sun light directly hitting the oor just in front of the system (e.g. glass ceiling).
To answer this particular conguration, a matte oor sticker can be installed in front of the system.
› Do not store your device near magnetic elds. A device failure may occur.
3
PRECAUTIONS
Before using this product, please read the safety precautions to avoid any injury to yourself or
others, or damage the unit. Do not open or disassemble the unit, no element is useable inside.
Refer servicing to qualied staff.

PACKAGE 1 / 3
Left sensor
1
Right sensor
2
Top sensor
3
VESA mount
4
L-shaped metallic pieces
5
Screws & washers
6
7
2
3
1
NUC Player Intel Core i5
7
8
9 × M4 screws · 8 mm
4 × M8 screws · 35 mm
4 × M8 washers
Wireless touch Keyboard
8
4
CONTENT
Keyboard
+ +
T Y
8.8
4
5
6

55” Professionnal Display · SAMSUNG QH55R
9
9
11
13
User documentation
10
10
12
Power cable
11
Remote
12
Batteries AAA × 2
13
PACKAGE 2 / 3
5
CONTENT

Finishing plate
14
Stand · Accessories are inside (front side)
15
14
15
ACCESSORIES
You will nd a plastic bag inside the stand (front
side) which contains:
1 × HDMI cable
1 × power cable · For the stand
1 × 5V "Leicke" power cable · For the top sensor
1 × pack of bolts, screws, washers, …
1 × clamping tool (black 3D printed tool)
PACKAGE 3 / 3
6
CONTENT

7
BE READY
TIP
For an easy assembling of the VESA mount on the
screen, use foam pad that you will place under
the screen. This way, you won’t have to carry the
screen when xing the mount in the back of your
screen.
Foam pad recommended dimensions:
(H) 160 × (L) 700 × (l) 700 mm.
STAFF TOOLS
› 3D clamping printed tool — provided
› Box spanner · Size 6
› Hex key · Size 3
› Hex key · Size 6
up to 3 persons
DURATION
35 minutes
Work package 1 · WP1
› 15 minutes › 2 persons
Work package 2 · WP2
› 20 minutes › 2 + 1 persons

WP1
2Put your foam pad on a at surface like a table for instance.
3Put gently the front side of the screen on the foam pad. That way, the back of the screen is accessible.
1ASSEMBLY OF THE VESA MOUNT
You have to add the 4 L-shaped metallic pieces to the back of the VESA mount.
› 2 long pieces On each long piece: 3 screws requiring 1 × M4 Bolt + 1 × M4 Washer each
› 2 short pieces On each short piece: 2 screws requiring 1 × M4 Bolt + 1 × M4 Washer each
1.1 Place the VESA mount vertically (on a table for instance).
1.2 From the back: insert the 4 L-shaped metallic pieces into the VESA mount.
1.3 From the front: x the 4 L-shaped pieces with M4 bolts (× 10) and M4 washers (× 10).
Long L-shaped piece
8
ASSEMBLY
Top
Bottom
10 × M4 BOLT
10 × M4 WASHER
+
BOX SPANNER 8
+
Short L-shaped piece

4ATTACH THE STAND TO THE SCREEN
4.1 Put the VESA mount on the back of the screen (which is placed on the foam pad).
4.2 Adjust the position of the VESA mount, making sure to align the 4 holes (colored in yellow
on the illustration below) with those of the screen.
4.3 Once the VESA mount and the screen aligned, assemble the 2 elements with 4× M8 bolts (35mm lenght).
Each bolt needs 1 M8 washer.
Power
SAMSUNG Screen
VESA Mount
WP1
9
ASSEMBLY
Top
Bottom
4×M8 BOLT 35 mm
4×M8 WASHER
+
HEX KEY 6
+

5ATTACH THE 3 SENSORS TO THE VESA MOUNT
For a easier identication, each sensor has a color sticker on it: / /
Find your Serial number (identical for all sensors) on a sticker applied on each sensor.
Place and screw on each sensor with 3 ×M4 screws 8mm (black screws):
› Top sensor at the top of the VESA mount.
› Left sensor on the right of the VESA mount.
› Right sensor on the left of the VESA mount.
Power
WP1
10
ASSEMBLY
Top
Bottom
9×M4 SCREWS 8mm
HEX KEY 3
+
TIP
The result (front view)
TIP
Table des matières

















