AFFIX MALT Series Manuel utilisateur

Assembly Manual
Linked Towers MALT Series
BS1139-6:2014
No: CE/21-22/046

01
Aluminium LInked Towers
MALT
The AFFIX Linked Tower is a mobile access tower manufactured in our
ISO 9001 accredited facility.
The AFFIX Linked Tower is a mobile access tower manufactured in our
ISO 9001 accredited facility.
This user guide provides you with step by step instructions to ensure your
system is assembled easily and safely, using the 3T (Through the Trapdoor)
method.
This user guide provides you with step by step instructions to ensure your
system is assembled easily and safely, using the 3T (Through the Trapdoor)
method.
BS1139-6 3 7/9 XXXD

WARNING
NEVER FORGET TO TIE
THE STRUCTURE
DESCRIPTION:
Through The Trapdoor (3T) Method:
The 3T method of construction is an approved method of assembly and it minimizes the risk of
a fall from height. The erector can complete an ‘assembly or access’ platform level from which
the ‘next lift’ of frames, braces and platform is added, until the final working height of the tower
is achieved. By following the 3T method, the erector sits through the hatch of the platform with
their feet resting on the frame rungs. In this position the erector can attach the guardrail braces.
Once guard-rails are secured in position the erector can climb onto the platform and continue
constructing the next level.
Compliances:
The Affix MALT Linked Tower structure has been tested and certified to BS1139-6: 2014 by TUV,
India
The Affix MALT Series Aluminium Linked Tower offers customer the flexibility to work on the
long span platform of 7.5 Mtrs Length together by joining two Double Width Towers together
through and additional platform at multiple levels. The MALT Series towers allow the user to
work on longer platform with more workers to work simultaneously. This tower is ideal for use
when work is required to be at multiple levels simultaneously.
The information and instructions included in this manual are provided to help get the best
possible service from your MALT Series Aluminium Linked Tower. This user guide provides you
with step by step instructions to ensure your system is assembled easily and safely, using the
3T (Through the Trapdoor) method.
02

Maximum Safe Working Loads
The safe working load of the tower is 1250 kgs including its own weight.
The maximum safe working load of any individual platform is 250 kgs
evenly distributed.
If the tower is to be used for any specific loading contact
your supplier or the manufacturer, Affix Scaffolding WLL.
RECOMMENDATIONS :
Recommend a minimum of two people to assemble, dismantle and move the platform tower.
Check that all components are on site and in good working order.
Towers must always be climbed from the inside of the assembly using the ladder.
Lifting of components must be done inside the effective base area of the tower.
Damaged components or components from other tower systems must never be used.
Never build linked towers without correctly adopting the suggested stability solution.
Outdoor or Indoor towers must be secured to a building or fixed structure.
Linked towers must never be built as free-standing structures. Suitable tying-in must be used.
Do Not use boxes or steps to gain additional height.
Do Not lift or suspend an assembled mobile tower.
Beware of horizontal loads which can lead to instability of the tower. The Max. side force is 20kg.
Ensure that the assembly location is checked to prevent hazards during assembly or moving
and while working on the tower. Particular attention should be given to the ground condition,
whether level or sloping, obstructions and wind conditions. The ground condition must be
capable of supporting the tower structure.
03USAGE ADVICE
Aluminium Linked Towers

Safety Checklist :Safety Checklist :
Air speed and resultant action to be taken
Mobile towers - 3T Method Checklist
Beufort Scale
01 mph
12 mph
17 mph
25 mph
40 mph
Calm, smoke rises easily upwards No action needed
Cease work
No action needed, keep a watch
If expected, dismantle the tower
If expected, tie tower to a rigid
structure
Moderate breeze, raises dust
Gale force, cannot even walk
Raises loose papers, leaves and small
twigs move
Strong breeze, tree branches bend, unable
to use umbrella
3
4
5
6
Description Air Speed Action to be taken
Ensure all brace claws operate and lock correctly prior to erection
Inspect components prior to use
Tower upright and level
Tower properly tied in to a fixed structure
Diagonal braces fitted
Platforms located and wind-locks on
Toe boards located
Check that the guardrails are fitted correctly
04USAGE ADVICE

WARNING
NEVER STAND ON AN
UNGUARDED PLATFORM
Safe working load on the working platform is 250kgs evenly distributed.
ASSEMBLY PROCESS :
PREPARATIONPREPARATION
Locate the tower, ensuring ground is level.
Check the locking triggers in the bracing hooks such that they are working properly.
Make ready the tying in option.
Sort the braces into horizontal and diagonal braces, the diagonals are slightly longer.
Also note that the braces are differently color coded.
The load on the tower should not exceed 1250 kgs.
The maximum recommended platform height is 9M.
SAFE WORKING LOADS AND HEIGHTS
05
Aluminium Linked Towers

FIRST LEVEL
Insert the Base Jack with the jack
pipe inside the bottom of the tubes
of the 1st level 2 Rung Ladder Frame
and 2 Rung Span Frame.
DO NOT USE Hammer.DO NOT USE Hammer.
Step 1
06ASSEMBLY
Step 2.2Step 2.2
One person should hold the frame in
upright position during this step.
Hook both the bottom 2 Horizontal Braces
horizontally to both the Span frame's vertical
pipes, just above the 1st rung.
Step 2.1Step 2.1
Step 2

SECOND LEVEL
Step 3
Level the structure using a Spirit Level on
the Rungs and the braces.
If adjustment required, adjust using the
adjustable jack.
Step 3.1Step 3.1
Step 4
Step 4.1Step 4.1
07ASSEMBLY
Insert the 2nd level Walk-through Frame
and Ladder Frame into the corresponding
spigots of 1st level Span Frame and
Ladder Frame. For clamping instructions
refer to the Clamping Instructions section
on Page 20.

Step 6
Step 5
Step 5.1Step 5.1
Hook the Diagonal Brace to the 3rd Rung
of the 2nd level Walk-through Frame at
one end and the other end should be hooked
to the 1st Rung of the 2nd level Ladder
Frame on the other side.
Step 5.2Step 5.2
Hook the 2nd Diagonal Brace to the 1st
Rung of the 2nd level Walk-through Frame
at one end and the other end should be
hooked to the 3rd Rung of the 2nd level
Ladder Frame on the other side.
08ASSEMBLY
Hook the Diagonal Brace to the 1st Rung
of the 1st level Span frame at one end and
the other end should be hooked to the 1st
Rung of the 2nd level Ladder frame.
Hook the 2nd Diagonal Brace to the 1st
Rung of the 2nd level Ladder frame at
one end and the other end should be
hooked to the 1st Rung of the 1st level
Span frame.
Step 6.1Step 6.1
Step 6.2Step 6.2

Hook the Intermediate trapdoor platform
on the 2nd Rung of the 2nd level frames.
Make sure the trapdoor is towards the
ladder side.
Step 7
Step 8.1Step 8.1
Hook the lower pair of Horizontal Braces
to the 3rd Rung of both the 2nd level
frames.
Step 8.2Step 8.2
Hook the upper pair of Horizontal Braces
to the 4th Rung of both the 2nd level
frames.
Using the 3T method, standing on the
ladder and leaning back against the edge
of the trapdoor aperture, fit the horizontal
braces as mid rails and guardrails.
Step 8
09ASSEMBLY
Step 7.1Step 7.1
Also hook the Intermediate fixed platform
on the 2nd Rung of the 2nd level frames
beside the trapdoor platform .
Step 7.2Step 7.2